spiral conveyors for transport the concrete
USD $500 - $2,700 /Set
Min.Order:1 Set
Jiangsu Xincheng Construction Machinery Manufacturing Co., Ltd.
Introduction of 2014 new design spiral conveyors for transport the concrete :
This series of screw conveyor is mainly used to work with powdery storage tank like
cement silo to transport powdery material(such as cement,lime),and also can be used in metallurgy,light industry,food storagre,chemical engineering field,such as the transport
for pulverized coal,mineral powder,urea fertilizer,dry sand and flour.,etc.
Characters:
1. Leading professional design and manufacture;
2. Long servicing life;
3. Hot sale in both domestic and oversea markets.
Lsy series screw conveyor parameter:
ITEM | LSY100 | LSY120 | LSY140 | LSY160 | LSY200 | LSY250 | LSY300 | LSY400 |
Dia of screw(mm) | 90 | 115 | 135 | 163 | 185 | 237 | 285 | 362 |
Speed of screw(t/m) | 300 | 300 | 300 | 308 | 260 | 200 | 170 | 170 |
Dia of shell(mm) | 108 | 133 | 159 | 194 | 219 | 273 | 325 | 402 |
Standard output(t) | 7 | 10 | 15 | 25 | 40 | 60 | 90 | 120 |
Transport length(m) | 8 | 10 | 12 | 15 | 18 | 25 | 25 | 25 |
Operating angle | 45° | 45° | 45° | 45° | 45° | 45° | 45° | 45° |
Standard power(kw) | 1.1 | 2.2 | 3 | 5.5 | 7.5 | 11 | 18.5 | 18.5 |
Hig-performance power(kw) | 2.2 | 3 | 4 | 7.5 | 11 | 15 | 22 | 22 |
Structure for 2014 new design drying screw conveyor:
Standard package for spiral conveyors for transport the concrete is plastic film covered.
Jiangsu Xincheng Construction Machinery&manufacturing Co.,Ltd is a really factory and
can provide different engineering tasks and manufacture ideal construction machines
with advanced technology,excellent quality and high-quality service.
Our Factory and Clients we met in Canton Fairs:
Our Production Line for 2014 new design drying screw conveyor:
Our Main Products:
As a professional exporter, our target is to serve worldwide clients with high-quality
products, greatreliability, devoted responsibility,professional services and honorable
credibility to meet customers' requirements in all aspects. We will supply you 24
hours a day and 7 days a week after-sale services.
FAQ for 2014 new design drying screw conveyor
Use and maintence:
1.motor work direction conforms to the attention arrow,avoiding reverse.
2.material can't be mixed other things.
3.before adding material get the motor work first, before stop the motor the material should be transferred clearly.
4.if the machine won't be used for a long time ,the cover should be open and inside material be cleaned clearly.
Payment terms:
a).30% T/T in advance and balance before the shippment
b). L/C at sight
c).Others
Delivery:
7-20 days