Eco friendly easy assembly low cost small china office house design
USD $50 - $80 /Square Meter
Min.Order:50 Square Meters
Shandong Magic Housing Project Co., Ltd.
Eco friendly easy assembly low cost small china office house design
No. | EPS Panel House Components | Specifications |
1 | External Wall Panel | Double side 0.3mm-0.6mm color steel Middle core is 50-300mm EPS, density 8-20kg/m3 Internal frame uses 1.2-2.0mm U type channel steel |
2 | Internal Wall Panel | Double side 0.3-0.6mm color steel Middle core is 50-300mm EPS, density 8-20kg/m3 Internal frame uses 1.2-2.0mm U type channel steel |
3 | Roof Panel | Double side 0.3-0.6mm color steel Middle core is 50-300mm EPS, density 8-20kg/m3 Internal frame uses 1.2-2.0mm U type channel steel With surface dripping eave for water draining |
4 | Truss and Purline | Hot galvanized C steel, U steel, square tube |
5 | Ceiling | Sandwich panel, Waterproof gypsum board, common gypsum board, PVC board, etc. |
6 | Door | Steel security door, Aggrandizement wood door, Wood door, Aluminum alloy door, Sliding door, Folding door, PVC door, etc. |
7 | Window | Aluminum alloy window, PVC window,etc. |
8 | Stair | Hot galvanized C type steel, square tube, checkerde plate |
9 | Decoration | Latex, Wood plate, PVC plate and so on |
10 | Other Facilities | Kitchen: Kitchen cabinet, sink and other basic facilities Bathroom: washing basin, show head, and other basic facilities Bedroom and livingroom: bed, air-conditioner, ceiling fan etc. Others: solar system
|
House Design:
House Material
Roof Panel | External Wall | Internal Wall | Flooring Support | Trusses and Purlines |
75mm thickness EPS sandwich panel | 75mm thickness EPS sandwich panel | 75mm thickness EPS sandwich panel | 75mm thickness EPS sandwich panel | Hot galvanized steel structure |
House Installation Time and Process:
Total Building Area | Builders Needed | Working Hours | Remark |
42m2 | 4 builders | 2 hours | Without decoration or foundation work |
House packing and delivery:
Packing | Delivery | ||
20’FT container | 40’HQ container | 1-50 houses | More than 50 houses |
-- | contact me for exact data | 21 days | accordingly |
Usually ship with 40’HQ containers, one 20FT container can load around 70m2 EPS sandwich panel house,one 40’HQ container can load around 140m2 EPS sandwich panel house. | It takes around 15 days to purchase all the raw materials including all the extra doors, windows, decoration parts.
|
Loading Container:
Raw Mateiral Selection
Our Advantage |
Professional Team: With over 20 years experience on modular house, our engineering team can design the house as per your ideas. |
Our Factory Factory’s capacity is 5500m2 foam cement panel and 6000m2 EPS sandwich panel per day, |
Reputation: We get many good feedback from customers for saving time and cost. We donated modular houses for earthquake victims in Sichuan Province in 2013. |
Global Market: we have supported government projects in Russia, Australia, Malaysia, India, Suriname, Niger, Zambia, Chile and other projects in more than 3 0 countries. |
Technology: R&D of the patented foam cement panel modular house system, which has obtained 11 national patents. |
Quality Control: Passed TUV, Agrement, SABS, SGS quality testing system, including raw material quality testing, semi-finished product testing and finished product testing. |
Contact information and after-service: