Contract Manufacturing Electrical Control Panel Board Assembly
USD $0.18 - $1.58 /Piece
Min.Order:100 Pieces
Contract Manufacturing Electrical Control Panel Board Assembly
Specification:
- Contract Manufacturing Electrical Control Panel Board Assembly
- PCB make & Assembly
- Component Procurement & Material Management
- Cable and Wire Assemblies
- Plastics and Molds
- Function Testing Service
Moko PCB Board Fabrication Capabilities:
Layer | 1,2,4 or 6,upto 18 layers |
Material | FR4,CEM1,CEM3,Hight TG,FR4 Halogen Free,FR1,FR2 |
Order Quantity | 1-500,000 |
Board shape | Rectangular,round,slots,cutouts,complex,irregular |
Board type | Rigid,flexible,rigid-flexible |
Board material | FR-4,glass epoxy,FR4 High Tg,Rohs compliant,Aluminum,Rogers,etc |
Board cutting | Shear,V-score,tab-routed |
Board thickness | 0.2~4.0mm,Flex 0.01~0.25'' |
Copper weight | 1.0,1.5,2.0oz |
Solder mask | Double-sided green LPI,Also support red,white,yellow,blue,black |
Silk screen | Double-sided or single-sided in white,yellow,black,or negative |
Silk screen min line width | 0.006'' or 0.15mm |
Max board dimensions | 20inch*20inch or 500mm*500mm |
Min drill hole diameter | 0.01'',0.25mm.or 10 mils |
Surface finish | HASL,Nickle,Imm Gold,Imm Tin,Imm Silver,OSP etc |
Board thickness tolerance | ± 10% |
Copper weight tolerance | ± 0.25oz |
Minimal slot width | 0.12'',3.0mm,or 120mils |
V-score depth | 20-25% of board thickness |
Plated through holes | Yes |
Sink holes | Yes |
Design file format | Gerber RS-274X,274D,Eagle and AutoCAD'S DXF,DWG |
Lead Time For PCB Board and PCBA:
Single,Double sided | Four layer | Six layer | Above eight layer | HDI | |
Sample lead time(Normal) | 5-6 | 6-7 | 7-8 | 10-12 | 15-20 |
Sample lead time(Fastest) | 48 to 72 hours | 5 | 6 | 6-7 | 12 |
Mass production lead time(First batch) | 7-9 | 10-12 | 13-15 | 16 | 20 |
PCB Assembly | PCB Fab+Components Sourcing+PCBA=15 days |
Moko PCB and PCBA Products:
Quote Requirement:
*Gerber file of the bare PCB board.
*BOM (Bill of material) for assembly.
*To short the lead time, please kindly advise us if there is any acceptable components substitution.
*Testing Guide & Test Fixtures if necessary.