FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe
FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe
FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe
FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe
FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe

FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe

USD $680 - $1,100 /Ton

Min.Order:5 Tons

Supply Ability:
3000 Ton / Tons per Month
Port:
Tianjin
Payment Terms:
T/T

Quick Details View All >

Thickness:
1, 12
Section Shape:
Round
Outer Diameter:
8 - 80 mm
Place of Origin:
Hebei, China
Secondary Or Not:
Non-secondary
Application:
Structure Pipe

Hebei Province Gold Mysterious Pipe Co., Ltd.

Business Type: Manufacturer
Baoding Hebei China
Main Products: Seamless Steel Pipe ,Steel Pipe ,Alloy Pipe ,Carbon Pipe ,Special Pipe

Product Details

  FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe 

Manufacturer

Hebei Province Gold Mysterious Pipe Co.,Ltd

Brand

Jinao

Type

Manufacture & Sales  OEM

Process

Seamless, Cold drawn and Cold rolled

Material

20#(1020),  10#(1010),  45#(1045/S45C,CK45),  35# (1035) , Q345, 16Mn, 42CrMo

 

size

Outer Diameter

8 –80mm

Wall Thickness

1-12mm

Length

5-12m

Standard

 

SAE519,ASTM A106, A53,DIN st42, st45, st35, st37 and st52, GB 8162 

Contact

Elina Wong

Phone

0312-6721288

Address

Pangkou Automobile and Agricultural Accessories Industrial Park, Gaoyang County, Baoding City, Hebei Province

 

  

Package

 1.  Bundle packing.

 2.  Bevelled end or plain end or warnished as per buyer's requestments.

 3.  Marking: as per customer's requests.

 4.  Painting varnish coating on the pipe. 

 Delivery condition

 


COLD BRIGHT/BK

 

 


Delivery Time

25-30 days or as clients reqestments

 

produce process

 FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe

 

quality control

1.raw material inspection:to check the chemical composition 

2.heat pipes inspection: to check the tolerance and the outer diameter

ld pipes inspection:to check the OD&ID

4.general nspection:to check the OD&ID

5.finished product inspection:to check if the product is made according the customer's request

FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe

 

Packaging & Shipping

  Wrapped with polywoven bags, we use steel belt to pack the outside, polywooden cases or wooden boxes for thin wall thickness can be offered if required
FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe

 

our company

FANG BOLT/DRIFT BOLT TUBE 1045/45#,Q345 Seamless Carbon Steel Pipe

FAQ

 

1. How long will it take to produce an order?
It is within 30days for the purchasing and production time with container order and 10days for the sample.  

2. What is your minimum order?
Usually 5 ton for each size, please contact us when you are trying to purchase less than container load

 

3. What is your payment term? 
Payment is 30% deposit, 70% before shipment . 

 

4. Does the sample for free or not?
The samples are free if they are common sizes, You need to pay for the freight .

 

5. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001:2008, and there are as many as 6 times of test during the production of each product to ensure the quality.

 

6.How about the Third Party Inspection ?

We have been working with DNV,TUV,SGS,BV,CO,Lloyd's etc;

  

Contact Supplier

Mr. Kenny Cheng manager Chat Now
Telephone
86-312-6721288
Mobile
13273260909
Fax
86-312-6858999
Address
PangKou Auto Agricultural Machinery Parts Industry Park Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~