Carbon Steel Pipe For Auto Part Manufacture Price Per Ton
USD $605 - $1,350 /Ton
Min.Order:5 Tons
Hebei Province Gold Mysterious Pipe Co., Ltd.
DIN CK45/ASE 1045 STEEL flower notch Seamless Steel Pipe for machine
Q345 Mechanical Seamless Tubing & Pipe Steel China Manufacturer
Machinery Parts seamless steel tubes and pipes Flatten Well Annealed
Main Product Precision Seamless Steel Tubes with HEX Tooth Shape
0.75''-3.15'' Inch STD Seamless Steel Alloy Pipe CDS Manufacturer
Carbon Steel Pipe For Auto Part Manufacture Price Per Ton
Manufacturer | Hebei Province Gold Mysterious Pipe Co.,Ltd | |
Brand | Jinao | |
Type | Manufacture & Sales OEM | |
Process | Seamless, Cold drawn and Cold rolled | |
Material | 20#, 10#, 45#, 35# , Q345, 16Mn, 42CrMo | |
size | Outer Diameter | 8 –80mm |
Wall Thickness | 1-12mm | |
Length | 5-12m | |
Standard
| ASTM A519,DIN st42, st45, st35, st37 and st52, GB 8162 ,GB 8163 | |
Contact | Elina Wong | |
Phone | 0312-6721288 | |
Address | Pangkou Automobile and Agricultural Accessories Industrial Park, Gaoyang County, Baoding City, Hebei Province | |
Package | 1. Bundle packing. 2. Bevelled end or plain end or warnished as per buyer's requestments. 3. Marking: as per customer's requests. 4. Painting varnish coating on the pipe. | |
Delivery Time | 15to25 days or as clients reqestments
|
Common pipes
OD 8mm to 80mm
thickness 1mm to 14mm,
technology cold drawn and cold rolling.
annealing machine:(DELIVERY CONDITION ;soft)
special pipes
Includes hexagonal pipes, lemon pipes, rectangular pipes, angle pipes, square pipes and many other special shape pipes. We can also produce the special pipes as the customers’ requirements. We have the ability to create varies of moulds by ourselves.
our company
1. How long will it take to produce an order?
It is within 30days for the purchasing and production time with container order and 10days for the sample.
2. What is your minimum order?
Usually 5 ton for each size, please contact us when you are trying to purchase less than container load
3. What form of quotation do you offer?
FOB Tianjin, CIF and CNF Your destination
4. What is your payment term?
Payment is 30% deposit, 70% before shipment or 70 % L/C at sight for the container order 100% T/T in advance for LCL order or the sample order.
5. Does the sample for free or not?
The samples are free if they are common sizes, You need to pay for the freight .
6. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001:2008, and there are as many as 6 times of test during the production of each product to ensure the quality.
7. How do you to package the product?
Wrapped with polywoven bags, we use steel belt to pack the outside, polywooden cases or wooden boxes for thin wall thickness can be offered if required
8.How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,CO,Lloyd's etc;