Pressure Boiler / Structure / seamless Steel Pipe
USD $700 - $1,300 /Ton
Min.Order:5 Tons
Hebei Province Gold Mysterious Pipe Co., Ltd.
Boiler / Structure / seamless Steel Pipe
Company photo
Production line
Test equipment
Quality control:
1.Raw material inspection:to check whether the chemical composition is qualifed or not.
2.Heat pipes inspsection:to check the tolerance and the outer diameter.
3.Cold pipes inspection:to check the OD and ID.
4.General inspection:to check the OD and ID.
5.Finished production:to check whether the product is made according the customer's requirement.
Package
1.woven bags in bundles.
2.plastic caps at the ends.
3.as customer's request.
Shippment
20 feet container load 20-25 tons pipe, which length:<=5.8m;
40 feet container load 20-25 tons pipe, which length:<=11.8m.
We will consider bulk cargo when the goods are more than 200 tons to save freight fee for our customers.
Various seamless steel pipe
FAQ
1.Delivery date:15~30 days according to your quantity
2.Sample: free sample is available
3.Third party inspection: we accept third party inspection, and we did many times before.
4.Trade terms: EXW, FOB Tianjin, C&F/CIF your destination