Precision cold drawn seamless steel pipe with latest carbon steel pipe price list
USD $700 - $1,000 /Ton
Min.Order:5 Tons
Hebei Province Gold Mysterious Pipe Co., Ltd.
Precision cold drawn seamless steel pipe with latest carbon steel pipe price list
High quality first is our company's purpose for ever!
1.Product Name: seamless carbon steel pipe.
2.Size: OD 15-90mm Thickness 1-14mm Length 3-11.8m
3.Tolerance: OD/Thickness +/-0.15mm Lentgh+10mm
4.Production process: seamles, cold drawn
5.Delivery condition: BKW, BKS, NBK and GBK etc
6.Test: eddy current test or ultrasonic test
7.Payment:30% by T/T in advance
8.Price:It will be the best one when the order quantity can reach one full container.
9:Delivery: 25days after confirming the order
10:Usage: auto parts, machine parts, heat exchager tube, boiler tube and construction material etc
11:Price List for some pipes:
1): ASTM A179 pipe, Size, OD 19.05-50.8mm Thickness 2.11-4mm Length 4-12m FOBTianjin is 730-900USD/TON
2):STKM 13C pipe, Size, OD 15-89mm Thickness 1-4mm Length 3-11.8mm FOBTianjin is 705-1050USD/TON
1.Packaging:
1).Plastic film and woven bag bundling:
2).Wooden case packing:
3.Plastic caps on two ends.
2.Shipping:
1).20feet container load 20-25tons pipe whose length is under 5.8m
2).40feet container load 20-25tons pipe whose length is under 11.8m
3).We will consider bulk cargo when the goods is more than 200 tons to save freight fee for our customers
1.Any of your questions will be answered within 24 hours!
2.Designed service:Because our products are mainly made-to-order, we can develop new product according to the customer's requirement.
3.Sample service:
1.Hebei province gold mysterious pipe co., ltd is located at Pangkou industrial park, Gaoyang county, Baoding city, Hebei province, China.
2.Certificate:
ISO9001:2008
3.Testing:
1).Eddy current test:
2).Ultrasonic test:
Q1. Our company is manufacturer or trade company?
Our company is a professional manufacturer and our factory is about 70,000square meter.
Q2. What is MOQ?
Generally, MOQ for every size of pipe is 5tons. However, we can also accept a 1ton trial order in the first business.
Q3. How to ensure the production time?
1).Our production department must comply with production plan strictly.
2).Both merchandiser and related salesman must track the product all the time and inform the customer latest information in time if any change.
Q4. Our price is competitive or not?
We have been adjusting the price of the pipe according to the changes for the price of material and cost of labor in time.
Meanwhile, we will offer more discount to the customer according to the order quantity.