GB/T3639 EN 10305 Small Diameter Seamless Steel Pipe Precision
USD $750 - $1,550 /Ton
Min.Order:10 Tons
Hebei Province Gold Mysterious Pipe Co., Ltd.
GB/T3639 EN 10305 Small Diameter Seamless Steel Pipe Precision
10#/c1010
Chemical Composition(%) | Mechanical Properties | |||||||||
C | Si | Mn | S | P | Cr | Ni | Cu | Mo | Yield Strength ( σs ) | Tensile Strength ( σb ) |
0.07~0.14 | 0.17~0.37 | 0.35~0.65 | ≤0.04 | ≤0.35 | ≤0.15 | ≤0.25 | ≤0.25 | / | ≥205(25) (MPa) | ≥410(42) (MPa) |
End Shape | Beveled end, plain end, vanished as per customer's requirements | |||||||||
OD Tolerance | Normal:+/-0.10mm precision :+/-0.03mm | |||||||||
Surface Treatment | Oiled,Passication,Phosphate | |||||||||
Technique | Cold drawn | |||||||||
Inspection | UT/ET | |||||||||
Application | 1. Automotive and mechanical pipes | |||||||||
2. High Pressure Boiler Pipe | ||||||||||
3. Low and middle pressure fluid transportation pipeline | ||||||||||
4. Heat exchanger pipes | ||||||||||
Delivery Conditions | 1. BK (+C) | No heat treatment after last cold forming process. | ||||||||
2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | |||||||||
3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |||||||||
4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |||||||||
5. NBK (+N) | After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere. | |||||||||
Package | 1. Bundle Packing. | |||||||||
2. Plain end or vanished as per customer's request. | ||||||||||
3. Wrapped in plastic film bag. | ||||||||||
4. steel strips bundle | ||||||||||
5. Pack in wooden crate |
1. How long will it take to produce an order?
It is within 30days and 10days for the sample.
2. What is your minimum order?
Usually 5 ton for each size
3. What form of quotation do you offer?
FOB Tianjin, CIF and CNF Your destination
4. What is your payment term?
Payment is 30% deposit, 70% before shipment .
5.How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,CO,Lloyd's etc;