ASTM A519 Carbon and alloy Seamless Steel Tubes and Pipes
USD $650 - $1,120 /Ton
Min.Order:5 Tons
Hebei Province Gold Mysterious Pipe Co., Ltd.
ASTM A519 Carbon Seamless Steel Tubes and Pipes
Business Type | Manufacture and exporter | |||
Product | Carbon seamless steel pipe /Alloy steel pipe/special shape pipe | |||
SIZE | OD 8mm~80mm (OD:1”~3.15”) thickness 1mm~14mm | |||
8-80mm | 1-14mm | 1”-3.15” | SCH40-XXS | |
Material and standard | ||||
Chinese Standard | American standard | Japanese Standard | German standard | |
10# | A519 1010 | STKM11A | St37 St37-2 St35.8 | |
20# |
AISI1020 | STKM12A/B/C STKM13A/B/C STKM19A/C STKM20A S20C | St45-8 St42-2 St45-4 CK22 | |
45# | AISI1045 | STKM16A/C STKM17A/C S45C | CK45 | |
30CrMo | AISI 4130 | SCM430 | - | |
16Mn | A210C | STKM18A/B/C | St52.4 St52 | |
Terms&conditions | ||||
Packing | in bundle by steel belt; bevelled ends; paint varnish; plastic caps; marks on the pipe. | |||
Payment | T/T and L/C at sight | |||
Min.Qty | 10 tons per size. | |||
Tolerate | OD +/-1%; Thickness:+12.5% / -10%;length:+/-2 cm | |||
Delivery time | 20-45days for the minimum order. | |||
Application | Pipeline ,for conveying fluid, such as water, oil ,etc. |
We are a company specializing in the production of precision cold rolled and cold drawn seamless steel tube plant, is one of the biggest local factory.
Our products are widely used in automobile and parts manufacturing, agriculture, equipment manufacturing, machinery manufacturing and other industries, the production product diameter less than 80 mm, can according to customer request or drawing production, to meet customer special needs. Our client is a large car manufacturing company, domestic machinery and equipment companies, etc.
We develop new seamless steel tube for many customers, including: lemon shape, triangle, trapezoid, elliptic, gear type, flower type, hexagonal, etc used for agricultural equipment and auto production of seamless steel pipe. Can design production according to customers drawings or samples.
Welcome to visit our factory, hope to have the opportunity to cooperation.
test equipment:material chemical test-->(Better product start with better steel)
common pipe:
1. How long will it take to produce an order?
It is within 30days for the purchasing and production time with container order and 10days for the sample.
2. What is your minimum order?
Usually 5 ton for each size
3. What form of quotation do you offer?
FOB Tianjin, CIF and CNF Your destination
4. What is your payment term?
Payment is 30% deposit, 70% before shipment
5. Does the sample for free or not?
The samples are free if they are common sizes, You need to pay for the freight .
CONTACT US:
Name:Elina Wong
Skype:jinaoguanye3