light steel structure prefabricated commercial egg chicken house design for layers
USD $850 - $1,200 /Ton
Min.Order:25 Tons
Qingdao Senwang Steel Structure Building Stock Co., Ltd.
light steel structure prefabricated commercial egg chicken house design for layers
1.Construction Building Information:
Type | construction building |
Wide span | single span or multiple spans, the max span clear distance is 36m, without middle column |
Roof and Wall | option: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel |
Door and Window | PVC or Aluminum alloy; sliding door or rolled door |
Column and Beam | Option: hot rolled or welded H section, I section; painting or galvanized |
Purlin | Option: C-section or Z-section |
Local Climate | 1. Wind speed |
usage | For the Broiler |
Drawing | 1. according to clients' drawing |
2. design as per clients' dimension and requests | |
Package | Naked loaded in shipping container or as per requests. |
Equipment | According to the requirements of the customers |
Steel chicken shed project showing
Our Advantages: |
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement. |
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service. |
C. One stop shoping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part. |
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection. |
E. We have pretty good preservative treatment on this steel frame as follows,
a. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.
b. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions. |
Our factory have independent design institute and the Design qualification is the grade one .excellent design and the perfect price Beyond your imagination .If you want to a perfect warehouse and please provide to us that information wihich as follows;
Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)
_____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
we are big group factory and have more than 25 years experience of steel structure workshope project The first design&Engineering Service,Excellent product and perfect Has won the praise of customers and want to cooperation with more and more friends and customer add us team .
1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!
2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical
3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.
4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.
5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)