Aluminum Foil Duct Tape Without Liner
USD $2.11 - $2.75 /Piece
Min.Order:10 Pieces
Vary Era (Shanghai) Industry Co., Ltd.
Aluminum Foil Duct Tape Without Liner
Type: | Aluminum Foil Tape |
Item No.: | A-SU40 |
Material: | Aluminum Foil/Acrylic Adhesive |
Size: | 0.08mmX50mmX45m |
Work Temperature | Below -30~ above 100 °C |
Discription | 1. Good heat transfer performance 2. High quality adhesive with strong adhesion and holding power offers permanent sealing and bonding 3. Foil Tape Without Liner makes easy application 4. Good aging resistance both indoors and outdoors 5. Low moisture vapor transmission rate offers excellent sealing and patching performance |
Application | 1. Widely used for HVAC duct insulation 2. Used to fix thermal fin in refrigerator 3. Used to insulate heat exhuaster pipes 4. Used as anti-corrosion insulation 5. Joining and sealing flexible air duct seams and connections 6. Designed for sealing joints and seams of foil jacket facings in air-conditioning ductwork 7. General purpose holding, patching, sealing and masking applications indoors and outdoors
|
Certification : | SGS |
Packing: | 48 pcs in corrugated box |
Delivery date: | around 2 working days based on your order quantity |
MOQ: | 10pcs |
Supply Ability: | 6800,000pcs/month |
Payment Term: | T/T, L/C at sight or L/C at 30 days |
Samples Offer: | Offer free samples in reasonable quantity for customer quality checking. No including logistic charges. |
Samples arrangement: | Samples will be prepared for sending in about 3 working days. |
(And DHL 3-5days; UPS 3-5days; Fedex / TNT 3-5days to reach destination) |
Please contact our After-sales service department in time within 30days after you received the cargo. | |
Tel: 0086-21-56473185 Time: 9:00 a.m.- 6:00 p.m. (Beijing time) | |
Process | Please provide the copy of Sales Contract and describe the problems appeared. |
Problems confrimation | |
Slight problem: | Please send the proof to our After-Sales Department, we will reply within two days. |
Serious problem: | |
a | We will dispatch our Quality and Problems Appraisers to make a confirmation. |
b | Have a negotiation of the compensation and sign agreements. |
c | Our After-Sales Department will perform the duties as the agreements. |