China Supplier oil casing drilling pipe, Black Steel tubing casing pipe
USD $389 - $899 /Ton
Min.Order:25 Tons
Hunan Prime Steel Pipe Co., Ltd.
Specifications
Size | OD | 1/8” -48” (5.15mm-1829mm) |
Wall Thickness | 0.4mm-26mm SCH10,SCH20,SCH40,SCH80,SCH160,STD,XS, XXS | |
Length | 5.8m,6m,11.8m,12m ,SRL, DRL | |
Steel Pipe Type | Welded Steel Pipe (ERW, SSAW, LSAW), Seamless Steel Pipe | |
Steel material | Q195 → SS330,ST37,ST42 Q235 → SS400,S235JR Q345 → S355JR,SS500,ST52 20#, Grade B, Grade A | |
Standard | ASTM A106, ASTM A53, BS1387-1985, API 5L | |
Zinc Weight | 120g,270g,400g,500g,550g 30μm ,40μm ,60μm,70μm,80μm | |
Usage | 1)low pressure liquid, water, gas, oil, line pipe 2)construction 3)fence, door pipe | |
Ends | 1) Plain 2) Beveled 3) Thread with Coupling or cap 4) Chamfer 5) Groove 6) Screw | |
End protector | 1) Plastic pipe cap 2) Iron protector | |
Surface Treatment | 1) Bared 2) Black Painted (varnish coating) 3) Galvanized 4) Oiled 5) PE,3PE, FBE, corrosion resistant coating, Anti corrosion coating. | |
Section Shape | Round and Rectangular type | |
Inspection | With Hydraulic Testing, Ultrasonic examination, Eddy Current , Infrared Test | |
Package | 1) Bundle with steel strips 2) Woven bag | |
Delivery | 1) Container 2) Bulk carrier | |
Date of Delivery | Up to order quantity | |
Payment | T/T, L/C, D/P | |
Others | Galvanized pipe fittings such as flange,tee,elbow and so on can be also provided |
Company Introduction
Prime Steel Pipe is the export gateway of SHINESTAR STEEL GROUP. We are dedicated in providing and exporting high performance-price ratio welded & seamless steel pipes and fittings covering various steel grades. SHINESTAR HOLDINGS GROUP is the leading manufacturer and supplier in China. Our company was established in 1993 and is primarily engaged in manufacturing, exporting, stocking, and trading of Carbon Steel Pipes and Fittings. We are proud to provide our clients with value-based, full-service solutions beyond supplying steel. We offer risk mitigation, cost containment, inventory management, and scheduling proficiency to contribute to our customer's bottom line.
Certification
Production Process
Packing and Shipping
1, Big OD : in bulk
2, Small OD: packed in bundle with steel strips
3, Woven bag
4, Plastic bags, waterproof paper wrapped
According to customer's requirment
Exhibition Shows
Our advantages
a. Quick delivery: about 10 days under tons 50Metric after the hearing of irrevocable L / C or Deposit; (Lot of tubes made of high quality in stock)
b. We have very good reputation in this industry due to our high quality products and service.
c. We have the reasonable price: to be better support your business .
d. We have strong engineering team that can give best solution for your projects.
e. We have SGS, ISO certificate which can assure the quality of our products.
Contact us
Tel: +86-731-88739515/88739520
Email: sales8(@)
Website: