24" x 16", Barred Tee, ISO 15590-2 Gr. L415, WT - 11.9 x 8.4 Bevel End, Sour
USD $10.00 - $10.00 /Piece
Min.Order:1 Piece
Cangzhou Ok Pipe Fitting Co., Ltd.
33.5 deg elbow Diameter Nominal 30 in CS ASTM A234 Gr. WPB STD
Stainless Steel BW Fittings A403 WP304/304L, 316/316L in accordance to ASME B16.9, NACE MR-01-75
TECTUBI RACCORDI FORGIATI RACCORTUBI TK Butt Welding Seamless Carbon & Stainless Steel Fitting
BKL-EX THAI BENKAN BENKAN ERNE Butt Welding Seamless Carbon & Stainless Steel Fitting
1. Grade: BUTT WELD FITTINGS
Carbon Steel :A234 WPB and WPHY42 to 80
Low Temperature Pipes :A420 WP3 and WP6
Stainless Steel & Special Stainess Steel A403 WP 304/304L, WP316/316L, WP310, 317, 321, 347, 410, 904, H grades
A815 UNS S31803 – Duplex 2205 A815 UNS S32750 / S32760 - Super Duplex 2507
Alloys Steel :A234 WP5 / WP9 / WP11 / WP22 / WP91
Special Alloys Nickel Alloys
Nickel 200/201 - B366 - UNS N02200/N02201 Alloy 400 - B366 - UNS N04400 - Monel® 400
Alloy 600 - B366- UNS N06600 - Inconel® 600 Alloy 625 - B366 - UNS N06625 - Inconel® 625
Alloy 800H/800HT - B366 - UNS N08810/N08811 - Incoloy® 800H/HT Alloy 825 - B366 - UNS N08825 - Incoloy® 825
Alloy 276 - B366 - UNS N10276 - Hastelloy® C-276
Titanium Alloys :B363 Gr 1 / 2 / 5 / 7
2. Size: 1/2''---48''
3. Standard:JIS , DIN , ANSI, EN , GOST
4. Certification: ISO9001, SGS, CTI, ROHS
Our Workshop
Our Warehouse
Our Team
Packing Details : Standard Exported Packing
Delivery Details : 3-30 days after order
Size: 1/2" up to 60"
Schedule from 20 up to XXS
Type: Elbow 45° Elbow, 90°, Elbow Equal and Reducing Tee, Concentric and Eccentric Reducer, Cap Bend Special Radius (2,5D-3D-5D), Split Tee;
Materials: ASTM A 234 WPB 5-9-11-12-22; ASTM A 860 WPHY42-46-52-60-65-70; ASTM A 420 WPL 3,6
Standards; ASME, API, NORSOK, DIN, BS; JIS, KS
At OK Fitting we understand that our clients need a service that goes beyond product supply and we strive to offer a turnkey solution that they can trust.
Our One Stop Service is more than managing the project; we offer material consultation, design and calculations, prefabrication services and handle all quality plans, global logistics and documentation. However simple or complex your requirements, our experienced engineers can offer you the service that best meets your job requirements and schedules.
The energy and infrastructure sectors are subject to rigorous standards related to health, safety, and the environment. Our customers must be confident that the materials they use are fully certified, traceable, and meet applicable quality specifications.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: