1500g Geosynthetic Clay Liner with woven cloth and sand inside
USD $0.15 - $0.3 /Ton
Min.Order:2 Tons
Renqiu City Huayuan Chemical Fiber Product Co., Ltd.
specification(g)/m properties | 100 | 150 | 200 | 250 | 300 | 350 | 400 | 450 | 500 | 600 | 800 | |
Tolerances of weight(%) | -8 | -8 | -8 | -8 | -7 | -7 | -7 | -7 | -6 | -6 | -6 | |
Thickness(mm) | 0.9 | 1.3 | 1.7 | 2.1 | 2.4 | 2.7 | 3.0 | 3.3 | 3.6 | 4.1 | 5.0 | |
Burst strength(KN/m) | 2.5 | 4.5 | 6.5 | 8.0 | 9.5 | 11.0 | 12.5 | 14.0 | 16.0 | 19.0 | 25.0 | |
Elongation(%) | 25-100 | |||||||||||
Tear strength(KN) | 0.08 | 0.12 | 0.16 | 0.20 | 0.24 | 0.28 | 0.33 | 0.38 | 0.42 | 0.46 | 0.60 | |
CBRpuncture Strength(KN) | 0.3 | 0.6 | 0.9 | 1.2 | 1.5 | 1.8 | 2.1 | 2.4 | 2.7 | 3.2 | 4.0 | |
Opening size(O90/O95) | 0.07-0.2 | |||||||||||
Permeability(cm/s) | K × (10-1~10-3) K=1.0-9.9 |
Usage:
1. Filtration:The filtration layer of the dykes, river canal, seacoast, concrete slope,retaining walls. At the same
time of preventing the clay granule from passing, it allows the water and the gas pass through freely.
2.Separation:
The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of theairdrome and
parking lot and the groundsill, different dam materials. It isolates the soil and the gravel of two kinds different
granule pathway from the groundsill or other buildings.
3.Adding muscle:The highway, railway, soil-stone dam, breakwater, airport, backfill soil of retaining wall, slope protection, etc in which distributes the
earth stress, prevents the side-displacement of the earth body and improves the earth body stability.
4 Protection
It prevents the bank from being washed out, protects the bank and the bottom, prevents the water and soil
from being washed away.