brand new container shop
Negotiable /Unit
Min.Order:1 Unit
Qingdao Pacific Container Co., Ltd.
The container will conform to the following standards in their latest editions. | |||||||||||||||||||
No.1:Handling of the Worker Dorm Type 1 | |||||||||||||||||||
The container will be constructed to be handled under the following conditions without any permanent deformation or effect on its structural in | |||||||||||||||||||
(1) Lifting full by its top corner castings by means of spreaders. | |||||||||||||||||||
Bitmap
| |||||||||||||||||||
No.2:Technical parameter of Container dorm. | |||||||||||||||||||
1)Roof Load: 0.5 KN/sqm | |||||||||||||||||||
2)Wind Speed: 210km/h | |||||||||||||||||||
3)Temperature: -50°C-+70°C | |||||||||||||||||||
No.3:Dimensions of Work Dorm . | |||||||||||||||||||
Length | Width | Height | Remark | ||||||||||||||||
20HC | 6058mm | 2438mm | 2896 | Exterior Dimension | |||||||||||||||
5800mm | 2250mm | 2750mm | Interior Dimension | ||||||||||||||||
No.4:Handling of the Worker Dorm Type 1 | |||||||||||||||||||
The container will be constructed to be suitable for transportation in normal operating conditions by modes of: | |||||||||||||||||||
(1) Marine-on deck or in cell guided by vertical or diagonal lashings | |||||||||||||||||||
(2) Rail-on flat or container car secured at its bottom corner castings | |||||||||||||||||||
No.5:Ratings of Work Dorm dorm. | |||||||||||||||||||
Max gross weight(kg) | Tare weight(kg) | Payload(kg) | Remark | ||||||||||||||||
Worker Dorm Type1 | 15000 | 2000 | 12000 | ||||||||||||||||
No.6:Specification of work Dorm Type 1 steel structual | |||||||||||||||||||
6.1. Base and Floor The floor is composed of cross-member ,floor plate and bottom side rail. Bottom end / side rail t4.0m thick, SPA-H Floor Plate t18mm thick, PLYWOOD Cross-member t3.0mm thick, SPA-H 2) ROOF: Frame construction: 6mm welded steel profile; Roof Panel: t1.6mm thick, SPA-H Top end / side rail: t3.0mm thick, SPA-H 3) CORNER POSTS: Profile: Cold rolled 4.0 mm steel profile.. 4) WALL PANELS: Side Panel: t1.6mm thick, SPA-H PRESERVATION All the surface of the assembled container will have coating system as follows: Exterior Surface Epoxy zinc rich primer 30 Epoxy primer 40 Acrylic topcoat 40 Total 110 Interior Surface Epoxy zinc rich primer 30 Acrylic topcoat 40 Total 70 | |||||||||||||||||||
No.7:Container dorm. Decoration Information | |||||||||||||||||||
1) Wall and Celling: Insulation material plus board | |||||||||||||||||||
2)Floor:18mm plywood floor , | |||||||||||||||||||
3)Insualtion material:EPS | |||||||||||||||||||
4)Window:Plastic steel | |||||||||||||||||||
5)Door:Security door |