Welding steel pipe and tubes/welded steel pipe
Welding steel pipe and tubes/welded steel pipe
Welding steel pipe and tubes/welded steel pipe

Welding steel pipe and tubes/welded steel pipe

USD $600.00 - $600.00 /Metric Ton

Min.Order:3 Metric Tons

Supply Ability:
1000 Metric Ton / Metric Tons per Month
Port:
Shanghai port China
Payment Terms:
T/T

Quick Details View All >

Thickness:
0.70, 3.00
Section Shape:
Round
Outer Diameter:
8.00 - 75.00 mm
Place of Origin:
Jiangsu, China
Secondary Or Not:
Non-secondary
Application:
Structure Pipe

Zhangjiagang Jiasye Import & Export Co., Ltd.

Business Type: Trading Company
Jiangsu China
Main Products: steel tube ,tube straightener and cutter machine ,steel wire straightener and cutter machine ,steel wire drawing machine ,forklift truck

Product Details

 

product name: welded steel tubes

1. OD: 8.0--80mm,WT:0.70—3.0 mm
2. material : Q195, Q235, SPHC,SPCC, SPCD, SPCEN, DC01, DC04, ST12, ST14,ST15 etc
3. standard: GB/T13793-92, DIN2393,DIN2394, STAM 290 , EN10305,
4. length: 500-6000mm fixed length
5. surface protect: oiled or painting,
6. surface condition: bright surface, black surface
7.heat treatment: BKW, BKS, NBK
8. inner welding burr move: as customs’ requirement do or not (OD>16mm availble)
9. packing: wrapped in PVC sleeve and sackcloth in bundle or in strong wooden case

 
 
 

Questions and solve metheds

1. Are you a trading company and manufacturer?
Yes, we have have plant and trading company, we can deal business both, but do it as condition.

2. How can I get your prices?
Please show us your target tube size (OD ,wall), material (steel grade),coating types( coating types on OD/ID both), in coil or straight length tube(if length, how long per pcs?), quantity, packing requirement ,application and specialy requirement. Then,we can send you an exact quotation within 24 hours.

3.What's your MOQ?
For common coating type and common size, MOQ is 1000kg ; for specially coatinf type or specialy size need confirmed.

4. How can I get some samples to do quality approved?
After quotation confirmed, we can send some samples for testing, severl pieces tube are free,but big quantity maybe charged and freight should be bear by client.

5. What about the leading time for mass order producing?
Usually, 7-10 days for material preparing and producing after order confirmed, and 7 days for shipment booking and confirmed.15 days min for common size and type, special size and type need confirm.

6. Could the tube be customized for us?
Sure, we are professional supplier.when we confirmed and accept all your target requirement,we can customize the tube as your target.

 

special services

If clients have special requirement on the material, tube size, tube type, mechanical property, length, packing conditions, Pls contact us free. if we can do,we will do it as customizing. 

Contact Supplier

Mr. kevin lee general manager Chat Now
Telephone
86-512-58697360
Mobile
18921978360
Fax
86-512-58697361
Address
room.721 block B, No 117, shazhou west road,yangshe twon Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~