Popular cold drawn welded steel tube on alibaba

Popular cold drawn welded steel tube on alibaba

USD $600.00 - $600.00 /Metric Ton

Min.Order:3 Metric Tons

Supply Ability:
1000 Metric Ton / Metric Tons per Month
Port:
Shanghai Port
Payment Terms:
T/T

Quick Details View All >

Thickness:
0.70, 3.00
Section Shape:
Round
Outer Diameter:
8.00 - 75.00 mm
Place of Origin:
Jiangsu, China
Secondary Or Not:
Non-secondary
Application:
Structure Pipe

Zhangjiagang Jiasye Import & Export Co., Ltd.

Business Type: Trading Company
Jiangsu China
Main Products: steel tube ,tube straightener and cutter machine ,steel wire straightener and cutter machine ,steel wire drawing machine ,forklift truck

Product Details

Product Description


Product Name
Popular cold drawn welded steel tube on alibaba
Material
Q195, Q235, SPHC,SPCC, SPCD, SPCEN, DC01, DC04, ST12, ST14,ST15 etc
Size
OD: 8.0--80mm,WT:0.70—3.0 mm

Length
GB/T13793-92, DIN2393,DIN2394, STAM 290 , EN10305
Surface protect
SUS201, SUS304, SUS316, A2-70, A2-80, A4-80, 4.8 6.8 8.8 10.9 12.9
Surface condition
bright surface, black surface
Heat treatment
BKW, BKS, NBK
Inner welding burr move
as customs’ requirement do or not (OD>16mm availble)
Package
wrapped in PVC sleeve and sackcloth in bundle or in strong wooden case
Products Show
Workshop Plant
Testing
Packing & Delivery
Our Service
FAQ

1.Are you a trading company and manufacturer?
Yes, we have have plant and trading company, we can deal business both, but do it as condition.

2.How can I get your prices?
Pls show us your target tube size (OD ,wall), material (steel grade),coating types( coating types on OD/IDboth), in coil or straight length tube(if length, how long per pcs?), quantity, packing requirement ,applicationand specialy requirement. Then,we can send you an exact quotation within 24 hours.

3.What's your MOQ?
For common coating type and common size, MOQ is 3000kg ; for specially coatinf type or specialy sizeneed confirmed.

4.How can I get some samples to do quality approved?
After quotation confirmed, we can send some samples for testing, severl pieces tube are free,but bigquantity maybe charged and freight should be bear by client.

5.What about the leading time for mass order producing?
Usually, 15-25 days for material preparing and producing after order confirmed, and 10 days for shipmentbooking and confirmed.35 days min for common size and type, special size and type need confirm.

6.Could the tube be customized for us?
Sure, we are professional supplier.when we confirmed and accept all your target requirement,we cancustomize the tube as your target.

Contact Supplier

Mr. kevin lee general manager Chat Now
Telephone
86-512-58697360
Mobile
18921978360
Fax
86-512-58697361
Address
room.721 block B, No 117, shazhou west road,yangshe twon Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Steel Pipes
Categories
Hi~