Top level export t8 led tube 8ft one pin
USD $3 - $4 /Piece
Min.Order:1 Piece
Shenzhen CXWON Technology Co., Ltd.
Features:
Item Picture | Model | Base | Size | Materials | Lumen | Voltage | Watt | Colour Temperature | Angle |
T8-CXW-206 |
Single One Pin | 600mm |
Aluminum+Plastic | 900lm |
AC90-265V | 9w |
6000K 4000K 3000K |
150 Beam angle | |
T8-CXW-209 | 900mm | 1400lm | 13w | ||||||
T8-CXW-212 | 1200mm | 2000lm | 18w | ||||||
T8-CXW-215 | 1500mm | 2750lm | 25w | ||||||
T8-CXW-224 | 2400mm | 3950lm | 36w |
Product show:
Product Features:
Aplications:
1. Home lighting, Office Lighting, Factory Lighting, Worshop Lighting, Supermarket Lighting,etc.
2. Any situation of lighting needed.
3. Industry and Commercial Lighting.
Shipping:
Packing:
Power | Packing size(cm) | Package(pcs/CTN) | Weight(kg) |
5w | 53*27*13.5CM | 25 | 20KG |
LED T8 TUBE LED Light Trade Terms:
-Question: What is the Minimum Order Quantity(MOQ) for the T8 Tube light?
Answer: 1 pcs per model is available.
-Question: What’s the brand of LED chip?
Answer: Epistar SMD2835 Chip, or you can select it.
Question:. Do you have certificates about the led Tube light?
Answer: we have got CE,RoHS,FCC, EMC,LVD certificates
- Question: May I buy samples from you?
Answer: Yes, samples available.
- Question: What’s the leading time? (How long do you need to prepare my goods?)
Answer: 2-3days for sample orders. 7-10days for mass production orders (based on different quantities).
- Question: How will you delivery my goods to me?
Answer: We always ship by international express, air and sea.
5-7 days for air transportation, 3-5 days for international express. 20-40 days for sea transportation.
Queston : How much does it cost to ship to my country?
Answer : The freight will be given by the freight company based on your Gross Weight and CBM.
- Question: What is your product quality?
Answer: Our raw materials are purchased from qualified suppliers. And we have a strong quality control team to guarantee our quality according to AQL standard. The quality control system: IQC→PQC→FQC→OQC. Every process will be checked strictly. 50000Hours working span.Each finished product will go through at least 24 hours aging test before shipping
- Question: What is your waranty?
Answer: Our warranty is 3 years after delivery.
-Question. How to deal with when the goods have problem within 3 years ?
Answer: if the goods have some problem then we will assist you to solve it, we should check the problem first,then send the materis or send new goods to you.