RGB Tube LED Stage Light DMX Tube DMX lighting madrix led tube meteor lighting
USD $10 - $35 /Piece
Min.Order:100 Pieces
Shenzhen G&G Technology Co., Ltd.
3D dmx vertical tube, DMX lighting,madrix led tube meteor lighting,
Our Advantage
1, Manufacturer with our competitive price,
2.Excellent management and technology QC Depa.aftersale team,we can do high technology
aftersale service.good quality products.
3,Prompt response to your request,
4, Short delivery,
5, Reliable warranty
6, OEM/ODM
7.GG and YM brand get the good repulation from all over the world.
3D DMX Vertical Tube for stage.
Introduction:
1. Use High-brightness LED chips, clear and pleasant light beam, bright non-glare with G&G DMX controller, it can achieve color fading, chasing, water-running, picture and play flash and video etc.
2. Environment friendly, no harsh glare and buzzing noise, no flicker.
3. DMX signal is in parallel connection, avoiding all lights influenced by failure of one light in serial connection. It is much more easier for maintenance.
4. After installation, DMX addresses can be set by G&G’s DMX address programmer.
5. Waterproof design, energy-saving, low cost of maintenance, and long lifespan.
6. DMX512 3D tube can be connected to DMX512 console and G&G’s LED controllers.
7. Double sided light effects can be seen from 360 degree angles.
Parameters:
Item Number: | GG-DMX3DT-050 | GG-DMX3DT-100 | |
Diameters: | 30mm | ||
Tube length: | 500mm | 1000mm | |
LED Type: | SMD5050 RGB 3-IN-1 | ||
LED Q’ty | 48 | 96 | |
Voltage: | DC12V | ||
Power: | 12W | 24W | |
View Angle | 360° | ||
Pixel Q’ty: | 8 | 16 | |
Control Mode: | DMX512 | ||
Working Temperature: | -40°C~60°C | ||
Material: | Clear/Transparent Imported PC | ||
Lifespan: | 50,000hours | ||
Protection: | IP65 |
Connection:
Application:
Bars, hotel, theatre, DJ, Night club, Dance hall, and so on.
Typical Application:
1.Payment methods:T/T,Western Union
100% payment if the total amount less than 5000USD
30% deposit and 70% balance before shipment if the total amount is more than 5000USD
2.Lead time:3-5 working days,subject to the order quantity
3.Delivery ways:DHL,EMS,UPS,FedEx door to door service,by sea, air and etc
4.MOQ:No MOQ for the first order