Rapid temperature raising 320 degree vertical heat conduction oil boiler/thermal oil boiler
USD $5,000 - $10,000 /Set
Min.Order:1 Set
Henan Yinchen Boiler Group Co., Ltd.
Rapid temperature raising 320 degree vertical heat conduction oil boiler/thermal oil boiler
Heat value: 10*104 kcal to 250*104kcal |
Fuel: coal, biomass, sawdust,wood chips |
Rated thermal power:0.12MW to 3.0MW |
Payment terms: 30% T/T in advance ,70% before factory delivery |
Delivery: Within 7-15 working days after received the down payment. |
Introduction:
• Simple structure, low cost.
• Adoption of top-mounted tube structure with large heat absorption area, high heat efficiency,
never be collapsed.
• Heat transfer oil enters into the boiler from the top and drains out from the bottom, which
cannot easily be coked, with long service life.
• Pre-test and post-test to make sure the safety of the Thermal Oil Heater.
Technical Parameters
Usage:
1.Chemical Industry --polymerization industry ,oil industry, reaction tank,distillation ,enrichment
2. Plastic industry ---plastic and squeeze to finalize the design
3. Textile industry --resin stenters ,dyeing machine and the dry room ,high temperature machine,
roller.
4.Rubber industry -rubber vulcanization heating
5.Food industry --cooking dry,vegetable oil refining
6.Wood industry --heating to finalize the design of chipboard sandwich plate ,wamu board,fiber
7.Paper industry-multi-layer cardboard of packed carton box ,dying and desiccation
8.Others-heating of metal electroplating slot ,coating condensation ,drying ,distillation of
pharmaceutical industry, reduction ,concentration,dehydration,airconditioning industry.etc
The Boiler Show
Oil Gas Fired Boiler Oil Gas Fired Hot Oil Heater Electric Boiler Double drum coal biomass boiler
Yinchen Group ia a company specializing in the research, design and production of boilers.With several researching and producing
bases in China,we can provide the powerful technical service and upper quality machinery for the clients all over the world.
All of our products are produced according to the International Quality Standards, such as CE from Europe
and ISO 9001quality management system.
Henan Yinchen Boiler Co.,Ltd
1.With "B" class boiler,"D" pressure bessel manufacturing license qualification.
2.Company headquarters covers an area of 60000 square meters,construction area of 4000 square meters.
3.Has 350 employees,technical elite 35 people.senior engineer 10 people,professional and technical personnel
15 people.
Web: http://www.yinchengroup.en.china.cn
Q1: Are you a factory or a trading company?How about your factory's strength?
1. Yinchen Group ia a company specializing in the research, design and production of boilers for about 20 years.
2.Company headquarters covers an area of 60000 square meters,construction area of 4000 square meters.
3.Has 350 employees,technical elite 35 people.senior engineer 10 people,professional and technical personnel 15 people.
Q2: What is the Warranty for the boilers?
3-year warranty with boiler spare parts becasue f quality questions.Boiler body has lifelong warranty period about quality.
Q3:How about the installation and commissioning service?
If customers need, our factory can send professional technician to take chage of installation and commissioning ,and also
can train your workers to operate the boielrs.
Q4: How long should we wait for delivery?
About the conventional models,we have semi-finished products, so about 15-20 days can finish delivery. Special models need about 30-40 days.
Q5:What about your payment term?
Usually it would be 30% deposit payment, 70% balance before delivery. We accept T/T, L/C and other payment way.
Q6: How about the boier'spacking and shipment?
Smaller boilers shall be loaded into 1x20 / 1x40HQ general container by sea, while the bigger ones shall be loaded into flat rack container.
No matter which condition, the boielr and spare parts will be fixed well to the container or flat rack by the professional workers.
Q7: what's your after-service?
When the boiler start to be installed and used in your working , our workers will be always keep in touch with you to know
the boiler's operation condition.when appear questions, we will solve with the clients together within 24 hours.
Send your inquiry details in the Below, click "send" Now!