portable wind power generation /turbine 50w 12V 24V
USD $130 - $150 /Piece
Min.Order:10 Pieces
Shenzhen Green Electricity Kang Technology Co., Ltd.
Product Specification and Price List for hyacinth system
Wind generator part | Model | Z-50W | Z-100W |
Name | Hyacinth | Hyacinth | |
Rated power | 50W | 100W | |
Rated DC voltage | DC 12V/24V | DC 12V/24V | |
Rated current | 4.4A/2.2A | 8.8A/4.4A | |
Rated speed | 1050r/m | 860r/m | |
Max power | 65W | 115W | |
Number of blade | 3 pcs | 3 pcs | |
Starting wind speed | 3m/s | 3m/s | |
Cut-in wind speed | 3.5m/s | 3.5m/s | |
Cut-out wind speed | 15m/s | 15m/s | |
Security wind speed | 45m/s | 45m/s | |
Rated wind speed | 12m/s | 12m/s | |
Engine | Three-phase permanent magnel generator | Three-phase permanent magnel generator | |
Rotor diameter | 830mm | 1050mm | |
Blade material | Carbon fiber reinforced plastics | Carbon fiber reinforced plastics | |
Output line anti-winding device | Overall three-phase commutator | Overall three-phase commutator | |
Over-speed wind protection | Tip stall protection + turned protection + Electromagnetic brake | Tip stall protection + turned protection + Electromagnetic brake | |
Life span | 10 years | 10 years | |
Equipment surface protection | Galvanization plastic coating | Galvanization plastic coating | |
Working temperature | -40°C-70°C | -40°C-70°C | |
| N.W. | 2.6kg | 2.8kg |
Packing material | Carton box and foam material | Carton box and foam material | |
packing dimension | 620*260*220mm | 620*260*220mm | |
G.W. | 3.2kg | 3.5kg | |
Price (USD) | 130 | 160 | |
Tower part | Tower height | 3M(diameter 30mm zinced iron tube) | 3M(diameter 30mm zinced iron tube) |
G.W | 17kg | 17kg | |
Price (USD) | 80 | 80 | |
Controlling circuit equipment | Controller*Inverter
| 100W | 100W
|
Packing material | Carton box and foam material | Carton box and foam material | |
G.W. | 2.5kg | 2.5kg | |
PRICE (USD) | 90 | 90 | |
| Total price ( USD ) | 290 | 340 |
Remark: 1. the price is FOB, which is valid in seven days.The minimum order is 10 pcs.
2. delivery time: within a week; Payment: T/T, prior to delivery.