construction sealant/cheap construction materials,bituminous glue material
construction sealant/cheap construction materials,bituminous glue material
construction sealant/cheap construction materials,bituminous glue material
construction sealant/cheap construction materials,bituminous glue material
construction sealant/cheap construction materials,bituminous glue material

construction sealant/cheap construction materials,bituminous glue material

USD $1,300 - $1,500 /Ton

Min.Order:1 Ton

Supply Ability:
10000 Ton / Tons per Month
Port:
Qingdao Tianjin Shanghai Ningbo Shenzhen Guangzhou etc.
Payment Terms:
T/T Credit Card PayPal

Quick Details View All >

Place of Origin:
Hebei, China
Brand Name:
CD

Hebei Chaoda Seal Products Co., Ltd.

Business Type: Manufacturer,Trading Company
Xingtai Hebei China
Main Products: construction waterproof coating ,waterproof membrane ,self fusing tape ,hatch cover tape ,reinforced silicone tape

Product Details

construction sealant/cheap construction materials,bituminous glue material    /

 

Our main products:road pouring glue, polymer crack stick, crack tape, SBS waterproof membrane, wet-laid waterproofing membrane, transparent waterproof coating, non-cured rubberized asphalt waterproofing coating, cement-based JS composite waterproof material, cccw, semi-conductive adhesive tape, waterproof insulating composite adhesive tape, silicone rubber self adhesive tape, butyl rubber sealing clay, self adhesive rubber band.

Enterprise mission:Be Chaoda people, Walk Chaoda road, Chaoda waterproof covers all the bases.

Operation principle: Gratitude, integrity, responsibility, innovation.

 

1.Suitable for asphalt pavement, concrete pavement, parking crack Treatment.

2.Cracks in bridges and buildings waterproof Treatment.

3.High resistance to water damage ability and resistance to aging, long service life.

4.High flexibility, it can well adapt to dynamic changes of crack width.

construction sealant/cheap construction materials,bituminous glue material

 

Usage:

1.Preparatory work before construction

Material damage usage:According to formula, when the temperature of the sealant is in the regulation construction, 1kg sealant can seal a crack for length is 8m, width is 1cm, depth is 1cm. The estimating formula is width(cm)*depth(cm)*length(m)*0.12(kg), for example: width and depth all is 2cm, the longitudinal crack length is 15m,then the material damage usage is 2*2*15*0.12=7.2kg.

Heating sealant:In the hot melt kettle heating chamber, sealant is heated to melt until reach the specified construction temperature 180-193.

2.The construction technological process and requirements

Close to traffic:To ensure the safety in construction, first the traffic should be controlled, according to the regulations about highway maintenance work traffic control by the"road maintenance technical specifications", put conical standard and moving vehicle sign, and has the specialist to charge of directing traffic and with the construction progress timely move the sign.

slotting:According to designed slotting size, adjusting the width and depth of grooving machine, then having the slotting work. Timely adjust the slotting size according to the change of the crack in the process of construction, and meet the minimum design requirements.

Raked joint:The dust and sundries in the in-groove and two sides at least 5cm should be cleaned up by forest fire extinguisher.

Preheat: Sealant should be used in the road surface temperature more than 4.The viscosity maybe reduced under low temperature, because of too much steam in crack, if under 4,a proper method can be used to heat to ensure to meet minimum requirements. If need to seal under 4,thecrack must be dry, no water and sundries. The temperature of sealant should be maintained in a safe heating temperature. There should be the specialist to inspect the sealant to ensure the adhesive.

Crack pouring:When the temperature of sealant is between 180-193,usingpressurenozzle with calibrating in the crack seal terminalto make the sealant be evenly poured into the tank.

Maintenance:After crack pouring by sealant, the traffic can not be opened immediately, but when the sealant is sufficiently cooling. Cooling time is about 15 minutes, a thin layer of sand should be sprinkled on the sealant when it is hot. Specific implementation, it can be flexible according to the temperature condition.

3.key points in the construction

1.The temperature should be between 180-190,but no more than 204.

2. Slotting size should meet the minimum design requirements, that is width ≥1cm,depth≥1.3cm.

3.Before cracking pouring, in-groove and two sides should be absolutely cleaned.

4.The road surface temperature should be more than 4,or preheat should be taken.

5.Before open the traffic, it should ensure enough cooling time of the sealant.

 

Construction drawing:

construction sealant/cheap construction materials,bituminous glue material

Product show: 

construction sealant/cheap construction materials,bituminous glue materialconstruction sealant/cheap construction materials,bituminous glue materialconstruction sealant/cheap construction materials,bituminous glue material

 

Factory show:

 construction sealant/cheap construction materials,bituminous glue material

Laboratory show:

construction sealant/cheap construction materials,bituminous glue material

 

 

Exhibition show:

construction sealant/cheap construction materials,bituminous glue material

 

 

 

Certification show:

construction sealant/cheap construction materials,bituminous glue materialconstruction sealant/cheap construction materials,bituminous glue material

Test report:

construction sealant/cheap construction materials,bituminous glue materialconstruction sealant/cheap construction materials,bituminous glue material

 

1.Before placing order, can we make sample firstly?

Sample can be arranged to send to you to test before placing order.

Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .

But we are afraid freight charge will be paid by yourself.

Certainly, we will adjust additional sample and freight charges into your bulk order.

2.How can I get your sample?

Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.

Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.

3.Whether we can print our logo or need our color or size or not?

Yes, because we have our own factory and R&D team, so we can make products as your demands.

We can print your logo, we also can make as your size and print it as your color.

4.How many kinds of payment terms you can accept?

About payment terms, we would like 100%TT if less than $1000.00

Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.

We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.

 

 

 

Contact Supplier

Telephone
0086-0319-3128229
Mobile
15613910413
Fax
0086-0319-2600323
Address
Room 727, 728, 729, 730, C Zone, World Trade Skyway,Qiaodong District Xingtai,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Multifunctional Materials
Categories
Hi~