Placer Gold Trommel Washing Machine
USD $1,000 - $30,000 /Set
Min.Order:1 Set
Zhengzhou Jinma Mining Machinery Co., Ltd.
Placer Gold Washing Trommel Screen Machine
Gold trommel screen machine features and benefits
Gold trommel screen machine working principle
1>Input of raw materials through heavy equipment
Raw materials inputted through the entrance of the hopper will be pushed into the trommel screen by the strong water pressure of the shower equipped in the HOPPER.
2>Selection and cleaning of raw materials
Raw materials of the trommel screen will be cleaned and selected by the rotation of trommel screen and, by watering of the shower inside, run into the gold dust separate panel.
3>Collecting of gold dust separated
Soil and sands with lighter specific gravity will flow away but gold dusts with greater specific gravity will be staying in the gathering mat to be collected.
Gold trommel screen machine technicial parameters
Model | Capacity | Power | Screen Diameter | Screen Length | Discharge Size | Input Size | Dimension | Weight |
(t/h) | (kw) | (mm) | (mm) | (mm) | (mm) | (mm) | (kg) | |
GTS1015 | 5-10 | 3.0 | 1000 | 1500 | 0~100 | ≤300 | 2600×1400×1700 | 2200 |
GTS1020 | 10-20 | 4.0 | 1000 | 2000 | 3390×1400×2140 | 2800 | ||
GTS1225 | 20-50 | 5.5 | 1200 | 2500 | 4146×1600×2680 | 4200 | ||
GTS1530 | 50-80 | 7.5 | 1500 | 3000 | 4460×1900×2820 | 5100 | ||
GTS1545 | 80-120 | 11 | 1500 | 4500 | ≤400 | 5960×1900×3080 | 6000 | |
GTS1848 | 100-160 | 15 | 1800 | 4800 | 6500×2350×4000 | 7500 | ||
GTS2055 | 150-250 | 22 | 2000 | 5500 | 7500×2550×4800 | 9600 | ||
GTS2265 | 200-300 | 30 | 2200 | 6500 | 8500×2750×5000 | 12800 |
Gold trommel screens are in making process
The fixed trommel screen made by Jinma company:
The mobile trommel screen made by Jinma company:
The mobile trommel screen with sluice box and gold carpet:
Gold mining equipment alluvial washing plant in clients' sites
The complete process of gold selecting :
In addition, we could manufacture the related gold selecting machine,such as,belt conveyor, gold shaking table.
1>The belt conveyor to convey the materials:
2>The gold shaking table use for getting fine final products:
1>.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2>.Sale services: servant
Send technicians to the jobsite for guiding the installation and adjustment, training operators and finishing the check and accept together with you.
3>.After-sale services: faithfulness
To establish long term friendship, we will regularly pay return visit to customers.
Supplying technique, building design, instruction, installation and debugging for free.
4>.We provide one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long time.
1.How long is the delivery time of your equipment?
The delivery time is within 30 working days. But when the project is very big and the customers have special requirement on the equipment, the delivery could be extended.
2.How long is the equipment warranty period?
Our equipment warranty period is 1 year. Wearing parts and problem coursed by worker’s wrong operation are not included.
3.Can you provide wearing parts?
We have two casting factories that specialize in produce wearing parts for our clients. If your equipment are not manufactured by our company, please provide us the wearing parts drawing.
4.Can you give me a solution and quotation?
Of course, to provide accurate solution and quotation, please give us background information, including, raw material, the capacity, max. input size, the output size, the usage of final products, etc.
If you want to learn more about the products,you could contact me.
Name | Cathy Chen |
Skype | cherish2228617703 |
Mobile | 86-13939060840 |
Looking forward to having a win-win cooperation with you.