High Efficient saving energy Cement Making Plant
High Efficient saving energy Cement Making Plant
High Efficient saving energy Cement Making Plant
High Efficient saving energy Cement Making Plant
High Efficient saving energy Cement Making Plant
High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making Plant

USD $1,000 - $80,000 /Set

Min.Order:1 Set

Supply Ability:
100 Set / Sets per Month
Port:
Tianjin Qingdao or as required
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Condition:
New
Production Capacity:
2-90t/h
Place of Origin:
Henan, China
Brand Name:
JINMA
Model Number:
GZMY
Voltage:
380V/220V

Zhengzhou Jinma Mining Machinery Co., Ltd.

Credit Member 4 years
Business Type: Manufacturer,Trading Company
Zhengzhou Henan China
Main Products: Ball Mill ,Crusher ,Trommel Screen ,Belt Conveyor ,Sand Washing Machine

Product Details

High Efficient saving energy Cement Making Plant

 

Product Description

 

1. Raw Materials
The main raw materials used in the cement manufacturing process are limestone, sand, shale, clay, and iron ore. The main material limestone is usually mined on site while the other minor materials may be mined either on site or in nearby quarries. Another source of raw materials is industrial by-products. The use of by-product materials  to replace natural raw materials is a key element in achieving sustainable development. 
 

2. Raw Material Preparation
Mining of limestone requires the use of drilling and blasting techniques. The blasting techniques use the latest technology to insure vibration, dust, and noise emissions are kept at a minimum. Blasting produces materials in a wide range of sizes from approximately 1.5 meters in diameter to small particles less than a few millimeters in diameter. Material is loaded at the blasting face into trucks for transportation to the crushing plant. Through a series of crushers and screens, the limestone is reduced to a size less than 100 mm and stored until required.
Depending on size, the minor materials (sand, shale, clay, and iron ore) may or may not be crushed before being stored in separate areas until required.   professional cement plant manufacturer 

 

3. Crushing and Pre-homogenization                          

During producing Concrete, most of the raw materials must be first crushed before being used to make concrete. These raw materials include lime stone, clay, iron ore and coal, etc. The lime stone is of the greatest usage to make concrete. With comparatively larger particles and higher hardness, crushing the lime stone to required fineness after mining is of relatively important consequence among crushing all those raw materials. There are many crushers used in crushing these raw materials, such as jaw crusher, impact crusher, cone crusher and vertical shaft impact crusher, etc. According to the raw materials' different particles and hardness, there are several suitable crushers which can be used in the crushing.

 

4 Grinding
Grinding is the last process of cement produce and the most current consuming working procedure. Cement clinker get grinded into the right size. The smaller the particle size is, the better the final cement is. It's important to choose suitable grinding machine.

High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making PlantHigh Efficient saving energy Cement Making Plant

High Efficient saving energy Cement Making PlantHigh Efficient saving energy Cement Making PlantHigh Efficient saving energy Cement Making Plant

The equipments we use in this whole cement plant are vibrating feeder, fine crusher, bucket elevator, silo,  belt conveyor, cement ball mill, bag filter, air classifier ,auto packing machine and so on.  All the necessary equipments in this line can be provided by our factory. We have cement production line experts to design specific solutions for your preference. 

High Efficient saving energy Cement Making Plant

 

 

Our Services

1. Pre-sale service: We can provide you with project design, process design, suitable purchase program for your equipment.

 

2. Sale service: We will accompany you to visit our factory and all kinds of machinery and equipment if you come here, also show you construction plan and assist in the development process in detail.

 

3. After Sale service: We will send technicians to the scene to guide the equipment installation, commissioning and training your operating personnel. 

Company Information

 Support & service from Zhengzhou Jinma Mining Machinery Co., Ltd.
1. Jinma provide the design, process diagram and foundation drawings according to clients' request.
2. Clients are welcome to inspect the equipment when the equipment are ready to delivery.
3. Equipment will be delivered with English Manuals and technical drawings
4. Engineers available to service machinery overseas, to make the layout design, foundations, guide the installation, commissioning run test, training workers, etc.
5.The equipment ordered from jinma will be guaranteed within 2 years since the day of purchasing if the problem is due to the equipment’s quality. If there is big quality problem with the equipment, the seller will discuss with the buyer and offer proposals to solve the problems within 72 hours since the notice from buyer.
6. Offer spares for the equipment within 10 years.

 

FAQ

1.How long is the delivery time of your equipment?

The delivery time is within 30 working days. But when the project is very big and the customers have special requirement on the equipment, the delivery could be extended.

2.How long is the  equipment warranty period?

Our equipment warranty period is 1 year. Wearing parts and problem coursed by worker’s wrong operation are not included.

3.What’s the after sale service of your company?

We will provide foundation drawing to the clients for installation. Besides, we can provide installation service, workers training service, etc.

4.Can you provide wearing parts?

We have two casting factories that specialize in produce wearing parts for our clients. If your equipment are not manufactured by our company, please provide us the wearing parts drawing.

5.Can you give me a solution and quotation?

Of course, to provide accurate solution and quotation, please give us background information, including, raw material, the capacity, max. input size, the output size, the usage of final products, etc. 

Quality Contrl

High Efficient saving energy Cement Making Plant 

Contact Supplier

Ms. Tracy xie Chat Now
Telephone
0086-371-67511065
Mobile
0086-15294626936
Fax
0086-371-85098580
Address
No. 8, Dianchang Road, Zhongyuan District Zhengzhou,Henan

You May Like

New Products

Find Similar Products By Category

Machinery > Building Material Machinery > Cement Making Machinery
Categories
Hi~