Alternating hot and humid test chamber price
USD $4,800 - $5,100 /Set
Min.Order:1 Set
Wuxi Harris Environment Equipment Co., Ltd.
This hot and humid test chamber is simulation under the condition of product in humid
climate environment combination (high and low temperature operation & storage, temperature cycle, high temperature and high humidity, low temperature and humidity and condensation test, etc.), check whether the adaptability and characteristics of the product itself.
Does need to be met the requirements of international standard (IEC, JIS, GB, MIL...).International quantum measurement procedures in order to achieve consistency (including test steps, conditions, methods) to avoid different cognitive, and narrowing the scope of measurement uncertainty.
Specification | THS-100UA | THS-150UA | THS-250UA | THS-500UA | THS-010UA | |||||
Workroom Sizes W*D*H (cm) | 50x40x50 | 50x50x60 | 60x60x70 | 80x70x90 | 100x100x100 | |||||
Inner chamber volume(V) | 100L | 150L | 252L | 504L | 1000L | |||||
Outer dimension W*D*H(cm) | 98x95x160 | 98x105x170 | 108x112x180 | 128x125x200 | 148x155x210 | |||||
Packing Size | 113x110x175 | 113x120x185 | 123x127x195 | 133x140x215 | 163x160x225 | |||||
G.W(kg) | 360 | 390 | 450 | 480 | 620 | |||||
Temperature Range | A: -20°C-150°C B: -40°C-150°C C: -60°C-150°C D: -70°C-150°C | |||||||||
Temperature Fluctuation | ≤±0.5°C(standard)/≤±0.2°C(optional) | |||||||||
Temperature Evenness | ≤±2°C | |||||||||
Temperature Deviation | ≤1°C | |||||||||
Accuracy | 0.1°C,1.5%R.H (standard)/0.01℃,1.5%R.H(optional) | |||||||||
Humidity Range | 20%~98%R.H/ 10%~98%R.H(optional) | |||||||||
Humidity Deviation | ±2% R.H | |||||||||
Temperature Rise Speed | 1.0°C~3.0°C/min | |||||||||
Temperature Down Speed | 0.7°C~1.2°C/min | |||||||||
Time needed for heating | RT°C~150°C≤30min | |||||||||
Time needed for cooling | RT°C~-40°C≤60min | |||||||||
The machine noise | 72 dB(A) | |||||||||
Load on the largest | 100kg,≤20kg/layer | 150kg,≤26kg/layer | 260kg,≤30kg/layer | 260kg,≤40kg/layer | 300kg,≤60kg/layer | |||||
Equipment installed power | ~3.25KW | ~3.55KW | ~3.95KW | ~5.5KW | ~6.25KW | |||||
material | Inner chamber:# SUS 304 stainless steel | The outer wall:A3 carbon steel plate with plastic spray/#SUS304 | ||||||||
Wind Cycling Way | Centrifugal fan forced air circulation | |||||||||
Refrigeration Way | Single stage compression refrigeration | |||||||||
Refrigerater | French Tecumseh | |||||||||
Refrigerants | R4O4A USA Dupont environmental protection refrigerant | |||||||||
Condensing Way | Air-cooled or water-cooled | |||||||||
Heater | Nickel chrome heating wire heater | |||||||||
Humidifier | Semi-closed steam and wet | |||||||||
Water Suplying Way | Automatic cycling water supply | |||||||||
Controller | Japan OYO/Korea Temi | |||||||||
Standard Accessoriesparts | 1 Observe window(double-deck cavity toughened glass),50mm testing hole,PL internal bulbs,partition plate,dry and wet ball gauze,3 fuses,1 power line | |||||||||
OEM is acceptable
Application: