New Technology Rubber Powder Production Line with ISO Certificate / Waste Tire Recycle Machine
USD $8,000 - $800,000 /Set
Min.Order:1 Set
Qingdao Bojia Machinery Manufacturing Co., Ltd.
Rubber Powder Production Line / Waste Tire Recycling Line
This rubber powder production line include the following process
1 remove the steel wires from the tire and put the whole tire to the tire breaker to get 50*50 rubber blocks.
2 crush the rubber blocks into rubber powder and seperate the steel wire.
3 using air suspension principle, to remove fibre from the rubber powder
The machines:
1 Rubber circle cutting machine
cut the sidewall from the tire
Item | parameters |
Power(Kw) | 5.5 |
Rotational speed | 46.8 r/min |
The maximum diameter of the tire | 1200mm |
Dimensions | 1100*900*1700mm |
2 Rubber circle press machine
seperate steel wire from the tire mouth
Item | Parameters |
Power(Kw) | 15 |
Front roller speed | 15.5 m/min |
Speed ratio | 1.1 |
Dimensions | 1520*1150*12101mm |
3 Rubber slitting machine
cut the tire into rubber strips
Item | Parameters |
Power(Kw) | 5.5 |
Millstone diameter(mm) | 380 |
Rotational speed | 18.4 |
Dimensions | 1290*870*1550mm |
4 Rubber blocks cutting machine
cut rubber strips into blocks
Item | Parameters |
Power(Kw) | 11 |
Main screw speed | 420 r/min |
Blade diameter | 200mm |
Dimensions | 1130*830*1100 |
5 Rubber crusher
crush the rubber blocks into 5-10 mesh rubber powder
Model No. | XKP-800 |
Front roller diameter(mm) | 560(smooth) |
Later roller diameter(mm) | 510(groove) |
Working length(mm) | 800 |
Front roller line speed(m/min) | 25.56 |
The rotational speed ratio | 1:1.30 |
Maximum roller spacing(mm) | 15 |
Motor power(kw) | 75 |
Dimensions(l*w*h)(mm) | 5070*2290*1980 |
Weight (kg) | 19000 |
6 Separate
separate the steel wire by magnetic separators
7 Fibra separator
separate the slight fibre from the rubber powder
model | FS110 |
capacity | 500kg/h |
power | 5.5kw |
dimension | 1.5*1.5*3.4 |
weight | 1.5t |
1 Free installation instruction
Customers will enjoy free installation instruction and training for different style. Installation pictures and video will be provided as your requirement freely.
2 24 hour service
You are welcomed to contact us whenever you have a doubt or a question. Our stong technician and engineer team will work out the solution to you within 24 hours.
3 One year warranty
Package: internal: stretch protection film
external: standard export wooden package
delivery: 30 days after receiving the deposit
Our company has passed the ISO quality management system certification
Qingdao Bojia Machinery Manufacturing Co., Ltd changed officially its name from a state-owned machinery company in October 2007, is one professional machinery manufacturer. Our company have one good and high quality design and manufacturing technology development group, often communicate with the customers and technology authority departments of rubber industry, constantly to improve and update our products which can meet the requirements of the customers; Our company guarantee to provide you excellent pre-market sale and after-sale service, timely technology information consulting, accessories and consumable parts supply etc, also can design and manufacture various non-standard products according to users’ requirements.
Our main products are: Conveying Belt Molding Machine Series; Batch Off Cooling Machine Series; Cushion Cloth Renovating Machine Series; Open Mixing Mill Series; Vulcanizing Press Series; Rubber Cutting Machine Series; Rubber Slitting Machine Series; Longitudinal Cutting Machine Series; Conveyer Belt Machine Series; Other Rubber Machines; Design and Manufacturing of Automatic Production Line.
Bojia Machinery Company always pursue "quality first, customer first" principle to offer high-quality products and excellent service, welcome new and old customers to visit my company.
1 Q: Are you a manufacturer or trade company.
A: We are rubber machine manufactruer with our own industry park.
2 Q: Can you design and manufacture non-stand machine?
A: Yes, We have our own design and product team. We have more than 10 years experience in this area.
3 Q: Are you near to Qingdao airport?
A: Yes, only 1.5 hours by car. If you arrive, we can drive to pick you.
60 minute to the Qingdao seaport
50 minutes to the Qingdao railway station.