Rubber Tube Factory Use Open Rubber Mixing Machine
USD $5,000 - $50,000 /Set
Min.Order:1 Set
Qingdao Bojia Machinery Manufacturing Co., Ltd.
Good price!XK series shoe factory natural opening rubber mixing mill/Rubber slipper making machine
Good price!XK series shoe factory natural opening rubber mixing mill/Rubber shoe making machine
High quality!XK-160&250&400&450&560&660 rubber mixing mill/mixing machine/rubber mixer
2015 Hot sale!!XK series rubber mixing mill/mixing machine/rubber mixer
XK series rubber factory natural opening rubber mixing mill/rubber mixer
Rubber Tube Factory Use Open Rubber Mixing Machine
Technical parameters
model | XK-160 | XK-250 | XK-400 | XK-450 | XK-560 |
roll dia(mm) | 160 | 250 | 400 | 450 | 560/510 |
roll working length(mm) | 320 | 620 | 1000 | 1200 | 1530 |
front-roll liner speed(m/min) | 8.95 | 14.1 | 18.65 | 24.26 | 27.72 |
roll ratio | 1:1.35 | 1:1.17 | 1:1.27 | 1:1.27 | 1:1.2 |
max roll space(mm) | 4.5 | 8 | 10 | 15 | 15 |
compound feeding capacity(kg) | 1-2 | 8~15 | 18-35 | 25-50 | 35~60 |
motor power(kw) | 5.5 | 18.5 | 37 | 55 | 90 |
dimension(mm) | 1380×860 | 3400×1500 | 4350×1850 | 5200×2380 | 5845×2284 |
Structure
The material of roller is chilled cast iron, with high hardness and wearness.
The rollers are cavity with cooling spraying water, which can make the surface of roller with even temperature.
The transmission system adopts hardened reducer, with low noise and long lifetime.
Hydraulic and electric reverse device will triggered when emergency occurs to ensure safe operation.
Application
This open rubber mixing machine is used for rubber plasticating, milling warm up and mixing. It is an importand machine in rubber mixing process and widely used in rubber tube, tire, shoes and seal produce factory.
Package: internal: stretch protection film
external: standard export wooden package
delivery: 30 days after receiving the deposit
1 Free installation instruction
Customers will enjoy free installation instruction and training for different style. Installation pictures and video will be provided as your requirement freely.
2 24 hour service
You are welcomed to contact us whenever you have a doubt or a question. Our stong technician and engineer team will work out the solution to you within 24 hours.
3 One year warranty
Our company has passed the ISO quality management system certification
Qingdao Bojia Machinery Manufacturing Co., Ltd changed officially its name from a state-owned machinery company in October 2007, is one professional machinery manufacturer. Our company have one good and high quality design and manufacturing technology development group, often communicate with the customers and technology authority departments of rubber industry, constantly to improve and update our products which can meet the requirements of the customers; Our company guarantee to provide you excellent pre-market sale and after-sale service, timely technology information consulting, accessories and consumable parts supply etc, also can design and manufacture various non-standard products according to users’ requirements.
Our main products are: Conveying Belt Molding Machine Series; Batch Off Cooling Machine Series; Cushion Cloth Renovating Machine Series; Open Mixing Mill Series; Vulcanizing Press Series; Rubber Cutting Machine Series; Rubber Slitting Machine Series; Longitudinal Cutting Machine Series; Conveyer Belt Machine Series; Other Rubber Machines; Design and Manufacturing of Automatic Production Line.
Bojia Machinery Company always pursue "quality first, customer first" principle to offer high-quality products and excellent service, welcome new and old customers to visit my company.
1 Q: Are you a manufacturer or trade company.
A: We are rubber machine manufactruer with our own industry park.
2 Q: Can you design and manufacture non-stand machine?
A: Yes, We have our own design and product team. We have more than 10 years experience in this area.
3 Q: Are you near to Qingdao airport?
A: Yes, only 1.5 hours by car. If you arrive, we can drive to pick you.
60 minute to the Qingdao seaport
50 minutes to the Qingdao railway station.