china wholesale custom industrial pizza oven
USD $500 - $1,417 /Piece
Min.Order:1 Piece
Foshan Nanhai Fufeng Electric Equipment Factory
◊Production Feature
◊ Technical Data
Commercila ElectricBelt Conveyor Pizza Ovens
Model | FEP-12 | FEP-18 | FEP-32 |
Size(MM) | 1100*570*370 | 1560*750*370 | 2500*1070*460 |
Power(Kw) | 6.7 | 10.3 | 25.5 |
Volts(V) | 220 | 380 | 380 |
Inner Size(mm) | 380*1000 | 530*1450 | 880*1800 |
N/W(Kg) | 45 | 65 | 85 |
◊ Produce Line
◊ Features
1. Transmission direction could be controlled freely
2. Top and bottom heating with individual controller
3. Easy handling for choosing front or rear discharge
4. Digital controller panel
◊ About Foshan Nanhai FuFeng Electric Equipment Factory
Since 2010, FUFENG has become to the most trusted supplier in the Restaurant Equipment with Food Preparation Equipment, Refrigeration Equipment, Cooking Equipment, Pizza and Concessions, Food Processors and Dishwashing Sanitation, especially in the Chicken Rotisserie, Doner Kebab, Ice Maker, Pizza oven.
FUFENG features over 2,000 kinds of products and up to 30,000 items after the decades of development. Please contact with our Trained Sales Consultants to get help with the restaurant equipment, the consultants will offer you the services of Consultation, Bakery Shop Design, Restaurant Kitchen Design, OEM, Project Solution, Quotation, etc.
◊ Company Picture
◊ Why choose us?
1. 6 years experienced service since 2010
2. Free spare parts supply for Bulk Purchase Order
3. Customized Solutions for Project Order
◊ Customer Visiting
◊ Workshop
◊ Package
◊ About Shipping
Express for samples DHL,FeDex,TNT,UPS,ETC | Container Cargo for Bult Order We Have Professional Shipping Team | Air Cargo Economic Fast Delivery |
◊ FAQ
What Methods of Payment Are Acceptable?
1. Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T Balance before shipment. 100% payment for sample orders.
2. Western Union: we accept 100% payment via the western union.
How About the Delivery Time?
Some of the products are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time 10~35 days depends on your requirement on the product. We will suggest you the fastest shipping method to you if you need the products urgently.
What Is the Cost of Shipping?
Shipping cost is based on the following elements:
Number of packages
Gross Weight of those packages
Package volume
Destination port
We will package your products in the strong export standard boxes. Your order will be sent via the least expensive carrier, unless you specify otherwise.
◊ After-sale Service
1 Year long warranty, we will send you the broken spare parts and instructions for matainance during the warranty
You will have lifetime support from our service.
Get the free spare parts for the matainance abroad.