Hot Sale Large Capacity Sweet Potato Flour Making Machine in Nigeria
USD $15,900 - $395,000 /Set
Min.Order:1 Set
Zheng Zhou Bizoe Imp.& Exp. Trading Co., Ltd.
Hot Selling Large Capacity Sweet Potato Flour Making Machine in Nigeria
Details of Bizoe sweet potato flour making machine:
1. Sweet potato convey, washing and peeling section
The fresh cassava roots transported by the conveyor into the feeder of the cleaning machine, then cleaning and peeling machine will remove the dirt and other foreign matters completely, and then the cleaning cassava in a temporary storage hopper into the next procedurethe grinding andrasping section automatically.
2. Sweet potato rasping&grinding section( Curved Mesh Crusher)
The grinding is the most important part of cassava starch extraction. Bizoe adopts Curved Mesh Crusher( national patent machine)with high efficiency allows the starch granules in the cassava cells to be released out completely.The machine adopts production works of multi-crushing, multi-washing, multi-filter, multiextrusion, which ensures minimum quantity of the remaining starch in the cassava residue and separating the starch from the cassava slurry and the cassava residue.
3. Filtering section(Desanding cyclone, filter)
Rasping cassava slurry is pumped through the fiber pump into the desanding cyclone.When the slurry enters desanding cyclone, the light phase of starch will come out of the top as overflow, and the heavy phase like sands will be discharged from the bottom, then cassava slurry will go into filter.
4. Starch concentration and refine section( starch hydro cyclone)
Starch hydro cyclone is another key unit which influences the cassava starch yields and quality. The cassava slurry enters the first stage centrifugal sieve from desanding cyclone,the slurry is separated into starch slurry and cassava residue under the centrifugal force. Starch slurry is pumped through the defoaming pump to the hydrocyclone station for washing starch, and the cassava residue is sent to second and third grade centrifugal sieves through fiber pump for starch recovery.thefresh water enters the hydrocyclone from the other end which washes starch. The overflow enters two grade recovery station to recycle starch, the bottom flow is washed.Through othergrade washing cyclone to ensure that the starch slurry does not contain impurities and final starch will be in accordance with national standar
5. Starch dewatering section( Vacuum Dehydrator and Overflow Air Flash Drying System)
The starch out of the cyclone station has 45% moisture so it must be dewatered and dried. The starchslurry enters vacuum dewatering filter tank from the starch milk buffer tank. Under the vacuum formed by the vacuum pump, the starch slurry is sucked to the drum surface, then filtrate goes through filter mesh and enters the filtrate separating tank. The starch cake remains on mesh surface and is scraped off by a scraper and transported by the conveyor belt into the air dryer. Then weighing and packing.
Flow chat of sweet potato flour making machine:
ca
Hot Selling Lagre Capacity Sweet Potato Flour Making Machine in Nigeria
Packaging: small and regualr machine shall be packed with wooden case, then container; large and irregular machines shall be nake packed, then container.
Delivery terms: within 45 days after received your deposite(for whole production line), within 15days after received your deposite(for single machine)
Main Ports: Tianjin, Shanghai, Qingdao, Ningbo, Weihai, Shenzhen or as you request.
As a professional exporter,our target is to serve worldwide clients with high-quality products,great reliability,devoted responsibility,professional services and honorable credibility to meet customers' requirements in all aspects. We will supply you 24 hours a day and 7 days a week after-sale services.
Our Service of sweet potato flour making machine
1) Our salers will give a detailed introduction and explanation to the whole line.
2) Our engineer will design the factory layout for you.
3) We can offer you the OEM, basis on your request.
4) We can offer the Turkey Project for your request.
5) We offer you the whole factory design and machines' installation drawing.
6) You can sell our worker to our factory for learning before the goods shipping.
7) We offer machine operation trainning for free when machine being installed.
8) One year warranty.
Warranty: 1 year
Delivery Time: within 45 days after received your deposite( for production line); within 15 days after received your deposite( for sinagle machine)
Payment terms: T/T, L/C, D/A, D/P or as you request.
Installation: professinal engineers are available to install machines in your country.
Zhengzhou Bizoe Importing & Exporting Com., Ltd.
Other machines in our factory:
May i invite you to visit our factory, i believe you will be satisfeied with our machine
1. If your machine is stainless steel?---yes
2. If your engineers are available to install machine in clients country?---yes
3. How many people will operate the whole line?---the whole line just need 4-5people.
4. If you can some discount for machine?---yes
5. If you company can offer factory design?---yes
6. Can you customize the machine for customers?---yes