warm white flexible strip outdoor lighted christmas train
USD $2 - $3 /Roll
Min.Order:1 Roll
Shenzhen Century Lighting Co., Ltd.
warm white flexible strip outdoor lighted christmas train
Specification:
OEM&ODM accepted
Place of Origin | Guangdong, China (Mainland) | |
Model NO. | CL-B004-3528SMD | |
Iuput voltage | DC12V | |
LED type | SMD 3528 | |
LED QTY | 30/60pcs SMD | |
FPC Size | 8*500mm/10*500mm | |
Protection Level | waterproof IP65/IP68 | |
Package | Blister/Antistatic Bag Packing | |
Beam angle | 120 degrees | |
PCB Color | White/Black/Yellow | |
Certificate | CE&RoHS |
Features:
1.Glue pouring(IP65) or silicone tube(IP68)
2. Color of PCB:Yellow,white,black available
3 Light source:Super bright SMD 5050/3528 Top LED
4. SMD3528 quantities:30/60pcs
5 Not need maintainence,low power consumption,easy installation,long life span
Application:
car decoration
Architectural decotative lighting
Edge lighting
Amusement park,theater and mood lighting
Emergency hallway lighting
Auditorium walkway lighting
Stairway accent lighting
Concealed lighting
Backlighting for signage letter
Channel letter lighting
Cove lighting
Indoor and outdoor decorative lighting
Window display lighting
Trade Terms:
1 Payment :T/T,30%deposits before production,70% balance to be paid before deliverying (Western Union or Moneygram are welcomed )
2 Production lead time for 100-50000pcs :7-15 days
3 Sample can be delivered in 3days
4 Shipping freight are quoted under your requests
5 Shipping port :Shenzhen ,Mainland China
6 Discounts are offered based on order quantities
About us
1. Ensure quality by sourcing LED from US(Cree/Semi), Korea(Samsung), Taiwan(Lumenmax), qualified capacitor for driver from China top supplier BERYL, these make us confident that we offer 2 years warranty on all of our CE, Rohs marked items.
2. Most products can close US Energy Star standard: Lumen maintaince >97% after 4000hs
3. Wider available correlated color temperature (CCT) of 2400K to 6800K.
4 99% LED lamp CRI>75, 80% LED lamp CRI>80
5. OEM and ODM samples can be finished in 10 days or less