Tests | Requirements | Results |
Tightness testing | Follow the standards: - IEC 61300-2-38 Method A
- IEC 60068-2-17 Test Qc No leakage under testing condition:
- Pressures: (40 ± 2) kPa
- Temperature: (23 ± 3)℃
- Testing duration: 15 minutes
- Testing deepness: place the whole closure into water.
| Qualification |
Hoarfrost testing | Follow the standards: - IEC 61300-2-26 Method A
- IEC 60068-2-11 Test Ka Ensuring no leakage and the cover of closure is not broken, color is not changed, eroded under testing condition:
- Pressures: 0 kPa
- Temperature: (35 ± 2)℃
- Testing duration: 5 days
- Place closure in the water environment with NaCl’s concentration of 5%.
| Qualification |
Drop testing | Follow the standards: - IEC 61300-2-10 Method A Ensuring no leakage under testing condition:
- Drop length: 75cm
- Temperature: (45 ± 2)℃
- Drop count: 1 time
| Qualification |
Vibration testing | Follow the standards: - IEC 61300-2-1
- IEC 60068-2-6 Test Fc Ensuring no leakage under testing condition:
- Vibration frequency: 10 Hz.
- Amplitude: ≥ 6 mm (peak to peak)
- Testing duration: 28 hours
| Qualification |
Other requirement | - Can install splitters to the closure (if there is special requirement).
- For some small capacity closure (under 48 cores) used for Branching to subscribers can require for ODF mini and integrate splitters inside.
- The closure cover can sustain affect of ultraviolet ray without broken or changing color.
- Working temperature: (0 – 60)℃
- Humidity: 100%
| Qualification |