Textile Use Biomass Steam Boiler Coal Boiler
USD $6,000 - $500,000 /Set
Min.Order:1 Set
Qingdao East Power Industry Equipment Co., Ltd.
Textile Biomass Steam Boiler Coal Boiler
A. The unique features of biomass boiler
Forming solid biomass fuels (referred to as biomass fuels, commonly known as: straw coal), is the use of new technologies and specialized equipment will crop straw, wood chips, sawdust, peanut shell, corn cob, rice straw, rice husk, straw bran, tree branches and leaves, hay and other modern compression molding carbon clean fuel, biomass fuel sources extensively, is an inexhaustible renewable energy, biomass burn rate of 96%, 4% of the remaining ash can be recycled K, achieved a straw - Fuel - fertilizer in circulation. Use of biomass fuels, clean and environmentally friendly, renewable energy, environmental protection consistent with national energy policy received strong advocate and promote.
Biomass fuels as coal, oil, natural gas, the fourth largest energy, it will become the worlds largest energy the most important. Biomass fuels containing sulfur are very low, there is no problem desulfurization, heat value in 3600 ~ 5100 kcal / kg, not only can replace the coal and other fuels, and its low cost, greatly reduced the cost of boiler operation, and fuel oil, gas, compared with electric boiler, the cost decreased by 60%, 40%, 70%.
boiler capacity of 1-10T / H (0.7-7.0MW).
B. Why do you choose biomass boiler ?
1. Lower dust emission & SO2 emission & NOx emission,
dust emission concentration < 30mg/m³
SO2 & NOx emission concentration < 200mg/m³
2. Boiler equips Inverter control, fuel combustion can achieve automatic adjustment.
3. We supply 2 units Water Pump (one duty one standby) which from the famous pump manufacturer.
4. Boiler can achieve automatic temperature control & pressure control & feed water control & feed fuel control & safety indication ...
We also freely supply you a set of inner parts of Electric controller for standby.
5. Boiler with anti-corrosion & anti-rust & beautiful appearance painting.
6. Comprehensive after-sales service.
We can design layout drawings of boiler system according to your actual requirement.
Also can dispatch engineer to guide installation & commissioning.
C.Biomass boiler parameter
ItemType wood and coal boiler | DZL1-1.0-M DZL1-1.25-M | DZL2-1.0-M DZL2-1.25-M | DZL3-0.7-M DZL3-1.25-M | DZL4-1.25-M | DZL6-1.25-M | DZL8-1.25-M | DZL10-1.25-M |
| |
Rated capacity t/h | 1 | 2 | 3 | 4 | 6 | 8 | 10 |
| |
Rated steam pressure Mpa | 1.0/1.25 | 1.0/1.25 | 0.7/1.25 | 1.25 | 1.25 | 1.25 | 1.25 |
| |
Rated steam temperature°C | 184/194 | 184/194 | 170/194 | 194 | 194 | 194 | 194 |
| |
Feed water temperature°C | 20 | 20 | 20 | 20 | 20 | 60 | 105 |
| |
Heat efficiency % | 80 | 80 | 81 | 81 | 83 | 85 | 87 |
| |
Fuel consumption kg/h | 179 | 358 | 531 | 707 | 1036 | 1382 | 1648 |
| |
effective area of boiler M² | 1.8 | 3.04 | 3.34 | 5.14 | 8.12 | 10.9 | 12 |
| |
largest size of boiler transportation mm | length | 4876 | 5290 | 5360 | 6258 | 6630 | 7486 | 7600 |
|
width | 1800 | 2240 | 2240 | 2700 | 3150 | 3200 | 3200 |
| |
height | 2870 | 3400 | 3500 | 3814 | 4186 | 3650 | 4000 |
| |
weight of largest parts of boiler ton | 13.5/14.2 | 20.8/21.9 | 22.1/23 | 29 | 32 | 35 | 47 |
| |
Notes:This form only for your reference,if any changed,please refer to Ex-factory technical documents. |
Q: Are you manufacturer?
A: Yes, we are manufacturer. Our factory is in Pingdu Qingdao established in 1993.
Q: Do I get guarantee of products?
A: Yes, every product is 1 year quality warrantee under customer correct using the products.
Q: Do you have any Certificate?
A: Yes. Each of our boiler has China GB certificate. If you need CE ASME or AS, we can help you to get it.
Q: How to buy it?
A: Please contact me by email or online, let me know your factory situation, I will give you some advice which model mostly suitable to you.
Q: What about the delivery?
A: We have shipping agent that can choose the cheapest and fastest delivery. FOB,CIF, C&F or EXW are no problem for us
Q: How can I pay you?
A: T/T, LC is very well used.
Q: What about the production?
A: Produce time is 20~25days for <6Ton boiler, 25~40days for >8Ton boiler.
Q: Could you offer some wear parts?
A: Yes, some chain grate bars, electric equipments in control panel box for example.
Q: What about the maintenance?
A: I will offer you the timely maintenance way after installation of the boiler mainly parts.