First Brand Pump Feed Water Pump for Boiler hot water or steam
First Brand Pump Feed Water Pump for Boiler hot water or steam
First Brand Pump Feed Water Pump for Boiler hot water or steam
First Brand Pump Feed Water Pump for Boiler hot water or steam
First Brand Pump Feed Water Pump for Boiler hot water or steam
First Brand Pump Feed Water Pump for Boiler hot water or steam

First Brand Pump Feed Water Pump for Boiler hot water or steam

USD $200 - $2,000 /Set

Min.Order:1 Set

Supply Ability:
1200 Set / Sets per Month
Port:
Qingdao Port
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
China
Brand Name:
Nan Fang
Model Number:
CDL
Type:
Other, Water Pump

Qingdao East Power Industry Equipment Co., Ltd.

Business Type: Trading Company
Qingdao Shandong China
Main Products: Boiler ,Steam Boiler ,Oil and Gas Fired Boiler ,Coal and Biomass Fired Boiler ,Hot Water Boiler

Product Details

Product Description

 The vertical multistage centrifugal pump, the motor shaft and pump shaft coupling, directly by coupling the impeller vane is made of stainless steel plate stamping welding or made of stainless steel precision casting, pump out

 a straight line from the bottom of the pump (with IEC or NEMA motor).

   Performance advantages:
1.High efficiency and energy saving
2.Compact structure
3.Overall and sealing, easy maintenance
4.Pipeline installation
5.Install the space is little

  Technical parameters:
1.Traffic: 0.4 m3 / h ~ 240 m3 / h
2.Head: 4 m to 305 m
3.Power: 0.37 kW to 110 kW
4.Liquid temperature: 15 ℃ ~ + 120 
5.Frequency: 50 hz / 60 hz

 First Brand Pump Feed Water Pump for Boiler hot water or steam

 

CDL Water Pump Parameter:First Brand Pump Feed Water Pump for Boiler hot water or steam

Packaging & Shipping

 First Brand Pump Feed Water Pump for Boiler hot water or steam

 

First Brand Pump Feed Water Pump for Boiler hot water or steam

 

Our Services

 Our Services:

1. 100%safety, running stably, excellent water level and pressure control, fully automatic operation. 
2. Boiler running life > 20years. 
3. Good after-sale service. It is free for you to get the damaged spares in warranty period (1 year) if there is any questions. Assure that we can supply you spares in boiler’s all life. 
4. We can arrange engineer to your company for installation and commissioning and training. If you need us at any time, we can send our technicians and prepare in a short time.
5. Special paint is used after assembly. Paint is particularly used in your climate area, which is anti-corrosion, anti-abrasion and color-fastness.

 Why do you choice our boiler? 

1. Lower dust emission & SO2 emission & NOx emission, dust emission concentration < 30mg/m³
SO2 & NOx emission concentration < 18mg/m³
2We supply 2 units Water Pump (one duty one standby) which from the famous pump manufacturer.
3. Boiler can achieve automatic temperature control & pressure control & feed water control & feed fuel control & safety indication.We also freely supply you a set of inner parts of Electric controller for standby.
4. Boiler with stainless cladding, anti-corrosion & anti-rust & beautiful appearance.
5. Comprehensive after-sales service. We can design layout drawings of boiler system according to your actual requirement.Also can dispatch engineer to guide installation & commissioning.

Company Information

First Brand Pump Feed Water Pump for Boiler hot water or steamFirst Brand Pump Feed Water Pump for Boiler hot water or steamFirst Brand Pump Feed Water Pump for Boiler hot water or steamFirst Brand Pump Feed Water Pump for Boiler hot water or steam 

FAQ

Q: Are you manufacturer?

A: Yes, we are manufacturer. Our factory is in Pingdu Qingdao established in 1993.

Q: Do I get guarantee of products?

A: Yes, every product is 1 year quality warrantee under customer correct using the products.

Q: Do you have any Certificate?

A: Yes. Each of our boiler has China GB certificate. If you need CE ASME or AS, we can help you to get it.

Q: How to buy it?

A: Please contact me by email or online, let me know your factory situation, I will give you some advice which model mostly suitable to you.

Q: What about the delivery?

A: We have shipping agent can choosing the cheapest and fastest delivery. FOB,CIF, C&F or EXW are no problem for us

Q: How can I pay you?

A: T/T, LC is very well used.

Q: What about the production?

A: Produce time is 20~25days for <6Ton boiler, 25~40days for >8Ton boiler. 

Q: Could you offer some wear parts?

A: Yes, some chain grate bars, electric equipments in control panel box for example.

Q: What about the maintenance?

A: I will offer you the timely maintenance way sheet after installation of the boiler mainly parts.

Contact US

First Brand Pump Feed Water Pump for Boiler hot water or steam 

Contact Supplier

Mr. Frank zhang Manager Chat Now
Telephone
86-532-66717007
Fax
86-532-66717006
Address
Hi-technology Park, Qingdao, China Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > General Industrial Equipment > Boilers & Parts > Boiler Parts
Categories
Hi~