Prefabricated Steel Structure Warehouse or workshop
USD $180.00 - $180.00 /Square Meter
Min.Order:10 Square Meters
Hebei Construction Group Co., Ltd.
• Environmental friendly
• Lower cost and maintenance
• Long using time up to 50 years
• Stable and earthquake resistance up to 9 grade
• Fast construction, time saving and labor saving
• Good appearance
The steel workshop warehouse building is widely used for
• workshop plant
• warehouse
• office building
• steel shed
• aircraft hangar etc.
1. Long history:Over 60 years experience in steel building design, supply and construction.
2. Quality material: We only use high quality materials.
3.Excellent team: We have a wide team of steel erectors.
4.One-stop service: we can arrange everything from design to planning permission to supply, construction and completion.
5.Offer supply: We offer supply only and you can self build your new steel building.
6.Rich experience: Our factory has a wealth of export experience.
7.Modern Design: Our group especially offer products with modern design elements for you.
8.Lasted Technology : We adopt the most advanced technology to be responsible for you.
Packing Details : Up to customers' requirement.
Delivery Details : Generally it is 10-20 days if the goods are in stock. or it is 20-40 days if the goods are not in stock, it is according to quantity.
1. Data for design:
Wind speed (KM/H)
Snow load: (KG/M2)
Rain load (KG/M2)
Earthquake load if have
Demands for doors and windows
Crane (if have), Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure!
2. Material quality:
Windows and doors quantity, size and location
Roof and wall material, sandwich panel or corrugated steel sheet (steel sheet can not heat insulation)
3. Type:
Size- width, length, eaveheight and roofslope
Single slope or double slope
Single floor, double floor or multi floor
A: We are factory.
A: Generally it is 10-20 days if the goods are in stock. or it is 20-40 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us.