8 ft trampoline parts, trampoline pad
USD $5 - $45 /Piece
Min.Order:500 Pieces
Shaoxing City Jiansheng Machinery Co., Ltd.
1. 310g/m2 PVC(500/500D)
2. 14mm EPE foam (closed-cell foam, high density, water proof, won't mildew or deform)
3. 130g/m2 PE
Packing in opp bag.
Packing in 5 ply or 3 ply brown box ( top opening box) with strap closed or tape closed.
Delivery time:
As usual, 20~25 days after deposit
T/T, 30% deposit, 70%balance against copy of B/L
As Trampoline is very big and heavy, shipping cost by air is too expensive. We usually suggest customer(by sea) to put it in recent container which will leave China soon.
Customer need to pay sample cost and shipping cost.
We finish sample within 7 days after received 100% payment in advance
1. Negotiation on detailed specs requirement, prices, delivery time.
2. Make agreement and finalize order
3. We start production after received 30% T/T deposit or original irrevocable L/C at sight.
4. We finish production within 20~25 days (general time).
5. Load on board and shipped from Chinese Port ( we ship from Ningbo port most, we do declaration to our customs)
6. Buyer pay the balance after seeing copy of B/L, Seller arrange telex release or send original documents to Buyer. (L/C is different, the bank will pay to negotiation bank on base there is no discrepancy on all documents and tansfer them to Buyer)
6. Container arrived in destination port, Buyer cleared their customs and pick up goods.
7. During the selling or After the sale, Buyer could reflect the condition( good or bad news) to us, we will congratulate good news and also deal with complaints instantly, carefully, sincerely.
We hope to repeat this cooperation process again and again with every customer.