Medium beer brew equipment, brewing Brewery System/Machinery/kits/appliance/device/facilities
USD $10,000 - $20,000 /Set
Min.Order:1 Set
Jinan Haolu Machinery Equipment Co., Ltd.
Welcome your inquiry
Our beer equipment can be used in restaurant, hotel, pub,
micro brewery, laboratory room, home or other places
based on your practical demand. We have bottle filing
machine or keg filling machine for optional.
Technical specification
Outside surface | RED COPPER,THK:1.5mm-3mm |
Inner surface | S.S.304,THK:2mm-4mm |
Top shape | Seal head or conical head |
Heating method | Natural gas/electricity/LPG/direct fire |
Insulation layer | Protected by rock wool,THK:70-100mm |
Polishing | ≤0.4µm |
Manhole | Side upward |
Spral ball | In the center of the inside tank |
Agitator | Raking system connected into a top reducer |
Chimney | On the top of the tank |
Working process of this beer equipment :
Item : Equipment list | Name | |
Milling System
| 01 | Malt Miller |
Saccharification System
| 01 | Boil spin heavy pot (red copper) |
02 | Saccharification filter slot (red copper) | |
03 | Saccharification wort pump | |
04 | Saccharification pipelines and valves | |
05 | Plate heat exchanger | |
06 | Platinum resistance temperature instrument | |
Fermentation System
| 01 | Fermentation tank |
02 | Fermentation pipelines and valves | |
| 03 | Platinum resistance Temperature instrument |
Refrigeration System
| 01 | Glycol ice water tank |
02 | Refrigerating Unit | |
03 | Ice water circulating pump | |
04 | Ice water pipelines and valves | |
05 | Platinum resistance Temperature instrument | |
Washing and sterilization System
| 01 | Washing pump |
02 | Alkali liquor washing tank | |
03 | Alkali liquor washing tank | |
Control System
| 01 | Saccharification Control |
02 | Fermentation Control | |
03 | Refrigeration Control | |
04 | Washing Control | |
Accessory
| 01 | &25 Hose |
02 | &38 Wired hose | |
03 | Iron shell thermometer | |
04 | Stainless steel four- way valves | |
05 | Stainless steel reducing nipple | |
06 | Butterfly pads | |
07 | Brix plan with temperature | |
08 | Inflatable head | |
09 | Bad rake exit | |
11 | Measuring cylinder |
After- Sale Service guaranty:
1) Assistant customer and in designing and planning plant rooms
2) Free installing and testing at job site.
3) One engineer service one client, 24 hours service line.
4). Free 1 years guarantee, lifetime warranty
5). The equipment are checked at your site by our engineer