2013 Newest led panel 6262 40W 3850Lm with TUV driver
USD $62 - $67 /Piece
Min.Order:10 Pieces
Shenzhen Betop Electronics Co., Ltd.
2013 Newest led panel 6262 40W 96LM/W with TUV driver
Features:
1. LED: 528pcs SMD3014
2. Input voltage: AC85-265 V
3. Frequency : 50/60 Hz
4. luminous efficacy >96lm/W
5. 3W LED down light CRI: >80 Ra
6. Environment temperature: -10°C-65°C
7. Life time: 40000hrs
8. LED Panel Light: CE ROHS TUV PSE Approval
9. Installation: Convenient and Efficient.
2013 Newest led panel 6262 40W 96LM/W with TUV driver
Specifications:
Model | Size | Power | Luminous Flux | CCT | CRI |
BT-MBD6262-40W | 617*617*45mm | 40W | 3850Lm | 2900-3200K 3700-4200K 5700-6300K | > 80Ra |
BT-MBD6060-40W | 597*597*45mm | 40W | 3850Lm | > 80Ra | |
BT-MBD30120-40W | 300*1200*45mm | 40W | 3850Lm | > 80Ra | |
BT-MBD60120-80W | 600*1200*45mm | 85W | 8000Lm | > 80Ra | |
3Years Warranty | LED Source:SMD3014 | ||||
Exteral Driver with CE ROHS TUV PSE Approval | |||||
Material: Cold Forging Aluminum+PMMA |
2013 Newest led panel 6262 40W 96LM/W with TUV driver
TRADE TERMS:
Usually EXW, FOB Shenzhen, CIF is acceptable, other terms are negotiable
PAYMEMT TERMS:
Sample order: Western Union, Paypal.
For over amount over 30% T/T in advance, 70% balance T/T before shipping.
SAMPLE ORDER:
We accept sample order for testing.
Minimum order quantity (MOQ):
Commonly at least 50-100pcs be appceted for trial order.
LEAD TIME:
Usually, our lead time is 7 workdays for ordinary order.
QC & QA:
Our professional QC checks the materials, products strictly. And our QA offer the full inspection of goods before shipment to assure everything is ok.
WARRANTY:
1) Warranty time: 3 years
2) Products returned within the warranty period must been BETOP products .Products of unknown sources or without valid working will not be accepted.
Backlighting LED Panel Light 600x600/620*620/625*625 40W output 3850lm, this item get warm reputation in UK EuroLED lighting show.
2013 Newest led panel 6262 40W 96LM/W with TUV driver
More Picture:
Installation Ways:
Factory Tour
Exhibition in 2013:
Welcome To Visit our Booth:
--Dubai Light MIDDLE EAST, 01-Oct to 03-Oct 2013
--HongKong International Lighting Fair,27-Oct to 30-Oct 2013