networking Cable With Power Cable UTP Cat5/Cat5e/Cat6 Network Cable,lan cable, communication cable
USD $20 - $50 /Roll
Min.Order:1 Roll
Shenzhen Lapplink Industry Co., Limited
networking Cable With Power Cable UTP Cat5/Cat5e/Cat6 Network Cable,lan cable, communication cable
Brand name | LINKINDUS |
Delivery time | sample 1 day/10-20 days upon your order quantity |
Standard/Certification | CE,ROHS,ISO9001 |
Cable length in Each box | 305m |
Package | Box,Carton,Polybag,according to your request |
Outer Jacket | PVC/PE |
Sheathing | PVC |
Insulation | PE |
MOQ | 1 box |
Port | Shenzhen or Guangzhou or any Chinese port |
Shipping | By Sea,By air,By express |
Conductor Material | CCA/CCAG/CU/BC |
Inner cable color code | Blue/White-Blue,Orange/White Orange,Green/White- Green,Brown/White-Brown |
Communication standard | TIA/EIA 568-B |
Attenuation(Max at 100MHZ) | 22dB |
Spectral Bandwidth | 100MHZ |
Characteristic Impedance | 100ohms+15% |
NEXT(Min at 100MHZ) | 35.3dB |
PS-NEXT(Min at 100MHZ) | 32.3dB |
Delay Skew(Max per 100m) | 45ns |
Return Loss(Min at 100MHZ) | 20.1dB |
Main market | Middle East,Southeast Asia,South America,Europe |
Certifiable | 305m |
Model | UTP Cat5e with 2p power cords |
Conductor Size | 0.50mm Cu for cat5e,0.75MM2 Cu for power cable |
| 0.45Mm/0.48Mm/0.49Mm/0.5Mm/0.51Mm |
Conductor Material | CCS/CCA/CCU/BC |
Number Of Conductor | 4P |
Shiled | UTP/FTP/STP/SFTP |
Flammability Grade | CMP,CMX,CM,CMG,MPG,CMR,MPR |
Indoor / Outdoor | Single Jacket/Double Jacket |
Insulation Material | PE,HDPE,LSZH PE |
Insulation Thickness | 0.91mm |
Jacket Material | PVC, ROHS PVC, LSZH PVC |
Outer Jacket Thickness | 9.2m |
DC Resistance(Max.) | 9.38 Ohm/100M |
DC Resistance Imbalance | 2.50% |
Working Capacitance(Max.) | 5.4Nf/100M |
Insulation Resistance | 10000 MOhm.km |
Transmission Velocity | 65% |
Operating Temperation | -40 °C - +75 °C |
PVC Jacket Color | As Client's Request. |
A. How can I place order?
You can contact us by email about your order details, or send us inquiry in below.
B. How can I pay you?
After you confirm our PI, we will request you to pay. T/T, Paypal and Western Union are the most usual ways we are using.
C. What’s the order procedure?
First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
D. What is your delivery time?
The delivery time is based on the quantity of the order. Normally our delivery time is about 15 days after the order confirmed.