Ore dressing shaking table price, shaking bed factory from China
USD $200 - $200,000 /Set
Min.Order:1 Set
Henan Fote Heavy Machinery Co., Ltd.
Ore dressing shaking table prices, shaking bed factory from China
Shaking bed Introduction :
shaking table separates the mineral granular based on the gravity differences between the different materials inside the pulp. When the pulp reached the table surface from the feeding channel, the granular in it will be effected by the gravity force, water flow force, the inertial force and friction force which comes from the reciprocating movement of the table surface, under the effect of these four forces, the granular inside the pulp will be classified and moved to the different direction: the high density one will go front and drop from the concentration end, the gangue will go to the tailing side, and the middles will be re-concentrated on the shaking table.
Shaking table Application:
Shaking table has been widely used in the rare metal dressing plant, such as scheelite, wolfram, tin ore, tin ore, placer mine, tantalite, columbite and etc. And also some times it been used to concentrating manganese ore and iron ore.
The shaking table normally had been put at the end of ore dressing plant as the final concentration process.
The Technical parameters of shaking table
name | unit | Shaking table for coarse sand | Shaking table for fine sand | Shaking table for slime | |
Table dimension | length | MM | 4450 | 4450 | 4450 |
Width of transition end | MM | 1855 | 1855 | 1855 | |
Width of concentrate end | MM | 1546 | 1546 | 1546 | |
Maximum feeding Particle size | MM | 2 | 0.5 | 0.15 | |
Feeding volume | T/d | 30-60 | 10-20 | 15-25 | |
Feeding concentration | % | 25-30 | 20-25 | 15-25 | |
stroke | MM | 16-22 | 11-16 | 8-16 | |
frequency | F | 15-48 | 48-53 | 50-57 | |
The table water volume | T/d | 80-150 | 30-60 | 10-17 | |
Horizontal angle | ° | 2.5-4.5 | 1.5-3.5 | 1-2 | |
Vertical angle | % | 1.4 | 0.92 | ---- | |
Table thinning out angle | ° | 32-42 | 40 | 42 | |
Beneficiation area | ---- | 7.6 | 7.6 | 7.6 | |
Table length ratio | ---- | 2.6 | 2.6 | 2.6 | |
Motor power | KW | 1.1 | 1.1 | 1.1 |
Shaking table Working Principle,
The working principle of Shaking Table is to use the combined action of the specific gravity
difference of sorted minerals, alternating movement of bed surface, and transverse oblique water
flow and riffle (or notch groove), to allow loose layering of ores on the bed surface and
fan-shaped zoning. Then different products can be produced.
Spare parts of shaking table machine ,
Fote heavy machine factory Information
Henan Fote Mining Machinery Co., Ltd., the former Henan First Machinery Factory, founded in Henan Zhengzhou-China machinery manufacturing capital in 1982, is a large joint stock company specialized in manufacturing heavymining machinery and civilian machinery.
Fote has six production bases with an area of 240,000 square meters more than 2000 employees, 60,000 square meter standardized heavy industrial plant, and about 500 sets of big and medium sized processing, riveting, welding and assembly equipment. After 30 year's construction and development, Fote has become famous production and export base of mining machinery and civilian machinery in China.
Customer visiting Fote factories ,
Fote was established since the year 1982, has over 2000 staff and Fote machinery have been exported to more than 90 countries and regionssuch as the United states, Russia, Kazakhstan, Turkey, Iran ,South Africa, Ethiopia, Eygpt, Vietnam, Malaysia, India,Korea, Australia,Chile,etc. Here some customer visiting pictures.
Shipment &Payment,
1)TT 30% As deposit and 70% Balance before shipping after examine goods.
2)West union, L/C ,T/T at sight etc. are all ok.
3)In general, 10~15 days after deposit, Accurate production time depends on production schedule .
4)The machines could be shipped by DHL, by train, by Air or by sea .
5)Normal export wooden and Carton case package .
6)We will always track and help you get the best Purchasing experience.
Our services
We provide 12months quality warranty to make sure your machine well runs consistently.
Pre-sale services:
a. Professional engineer design the production line for you
b.Recommend suitable equipment according to your special demand.
During-sale services:
a.Pre-check and accept products before delivery
b.Send technicians to the jobsite for guiding the installation and adjustment
c.Training operators and finishing the check to satisfy your requiremnet
After-sale services:
a.Common problem can be solved through web in 24 hours,complex problem can be reacted immediately in 24 hours and solved as soon as possible
b.To establish long-term friendship, we will regulary contact with our customer.
More information, pls feel free to contact Lolly Wang at 0086-13838353795 , will be waiting for you 7/24 hour.