Hot!! 1880 mm 19 t/d newspaper/copy paper making machine of Dingchen
Negotiable /Set
Min.Order:1 Set
Zhengzhou Dingchen Machinery Co., Ltd.
high quality! 1880 mm 19t/d newspaper writing paper making machine
Main frame of the equipment
Part name | Equipment | Specification | Quantity |
Mesh cylinder part | cylinder mould | 1500mm×2250mm | 1 |
| (stainless steel) |
|
|
| sealed pressure vat |
| 1 |
| couch press | 450mm×2250mm | 1 |
Dryer part | dryer can | 2500mm×2250mm | 1 |
| touch roll | 450mm×2250mm | 1 |
| Winger roll | 300mm×2250mm | 2 |
| Equipped with all the felt rolls, pneumatic loaded device. | ||
Winding part | sweat cylinder | 600mm×2250mm | 1 |
| Equipped with the 250 speed reducer(1 set) | ||
Drives and control | AC frequency converter and adjustable speed, processing transmission, digital sealed ring control system. |
Pictures of the paper machine
Number | Equipments | Quantity (SET) |
1 | 1880mm single-cylinder& single-wire toilet paper machine | 1 set |
2 | Exhaust hood of the dryer can(double layers) | 1 set |
3 | φ850 screw type ventilator | 1 set |
4 | Sealed pressure vat | 1 set |
5 | 15 type roots pump | 1 set |
6 | suction box | 2 sets |
7 | 5m3 high consistency hydrapulper | 1 set |
8 | 1.8m2 high frequency vibrating screen | 1 set |
9 | 35m3 rinsing machine | 3 sets |
10 | 380 double type pulp grinder | 1 set |
11 | φ700 Thruster | 5 sets |
12 | 606 sand cleaner (6 pcs) | 1group |
13 | Two-phase flows pulp pump-100 | 6 sets |
14 | Two-phase flows pulp pump-150 | 4 sets |
15 | Air pump | 1 set |
16 | Frequency conversion & synchronous control cubicle | 1 set |
17 | The whole set of work bench | 1 set |
18 | 2T boiler | 1 set |
Flow chart of paper making:
The trial installation workshop:
Paper machine manufacturing workshop:
Paper machine product workshop:
Picture of working paper machine:
Finished paper products:
The picture of paper machine loading:
International coopernation:
Perfect service:
1) Highly inspecting equipments in every working procedure, quality comes first;
2) Fast & Safe Delivery;
3) Assisting our clients for foundation construction of equipments;
4) Dispatching engineers to install and debug equipments;
5) Training the first-line operators on site;
6) Providing technical exchanging.