Integrated solar 200w LED flood light for parks
USD $1 - $150 /Piece
Min.Order:1 Piece
Sichuan Huati Lighting Technology Co., Ltd.
1. Rated power: 200W.
2. Using CREE/SAMSUNG LED chip;
3. Secondary bat-wing light distribution;
4. High efficient heat dissipation;
5. Working with AC-DC constant current drivers;
6. Modular design, hot plug-in LED modules, tool free onsite maintenance;
7. High heat dissipation aluminum alloy heatsink, no electromagnetic emissions,
no environmental pollution, and no UV radiation;
8. Energy efficient, environment friendly, and multiple patents.
9. FCC,CE,RoHS,UL,cUL,NOM,DLC approved.
Technical parameters
Specification
Model Aurora Series- Flood/Projection Light | HTZM-03200FG15A072C HTZM-04200FG15A072S |
Rated power | 200W |
Initial lm | 19200lm |
Weight | 10KG |
Dimensions(mm) | 490*418*72mm |
Rated voltage | AC220V/AC110V |
Power supply efficiency | >90% |
Power factor | >0.95 |
Lm/W | 95lm/W |
CRI | ≥70 |
Color temperature | 3000K,3500K,4000K |
Operation temperature | -40℃~+50℃ |
IP code | IP66 |
Lifespan | >5000 hours |
Installation mode | Adjustable installation angle |
LED chip | CREE, SAMSUNG |
Main material | Aluminum alloy |
Product Photo
Aurora Series
Energy Saving Description
Energy saving at least 50%
Easy maintenance and parts replacement
Installation
Packing
Standard packing
Applications
Squares,playgrounds,crossroads,parks,statues,warehouses and etc.
Stadium lighting Building facade lighting Squares/intersection lighting
Our Exhibition
Welcome to our factory
FAQ
Q1: How long does it take to get the quotation?
A1: For any interest of our products, you are very welcome to send us feedback or contact us through trade manager. We will reply ASAP! Generally it takes within 12hours.For any quick response, please call us directly.
Q2: How can I get a sample or quality check?
A2: Sample orders are welcome, however, we charge the sample cost.
Q3: Can you provide OEM or ODM service?
A3: Surely we can. We have 12years experience in lighting field.
Q4: What’s the lead time for mass production?
A4: It depends on the amount of orders. Generally it takes one month after deposit payment and confirmation of samples.
Q5: What is the terms of delivery?
A5: Generally we offer FOB, however, EXW, CIF , etc are also welcome.
You may also like:
Come on! Contact us for more information Now!!!