Construction scaffoldings Disc Lock Scaffolding
USD $7 - $20 /Set
Min.Order:500 Sets
Hebei Shuowei Metal Manufacturing Co., Ltd.
Steel Tubular Scaffolding, Steel Rigger Scaffolding, Steel Scaffolding Staging
Echafaudage, Hangings Scaffolding, Tubular Scaffolding, Four Way Ring Scaffolding
Used Steel Scaffolding, Four Way Ring System Scaffolding Stock, Ringlock Scaffoiding 48mm
steel scaffolding, steel hanging scaffolding, flying scaffolding, four way ring scaffolding
Real Factory of Ring Lock System, Bowl Lock Scaffolding, Four Way Ring Scaffolding
Ring-lock System Scaffolding consists of galvanized high-strength steel modular components that are assembled together using integral wedge connectors. It consists of vertical members with integral rosette connections welded to them at 19 inch (500 mm) spacing. The horizontal ledgers and diagonal braces are secured to the rosettes on the vertical tubes by means of end connectors that incorporate captive wedges. The system has a complete range of accessories, including: steel planks, side brackets, system toe boards, stairs, ladders and reinforced ledgers.
Horizontal ledgers are available in a variety of lengths, ranging from 2 ft 2 in (650 mm) to 10ft (3050 mm), enabling the system to be built in just about any configuration to suit the job at hand.
Parts of Hot selling adjustable steel props ring lock scaffold are:
Scaffold advantage disk
1, the disk Scaffold, hot dip galvanized unique technology, hot-dip galvanizing is simple with strong adhesion, long service life, a uniform coating film.
2, the disk Scaffold with low cost, high efficiency and unprecedented advantage.
3, the disc Scaffold strong high temperature, does not burn, bearing strength and strong core strengths
4, the disc has a large load Scaffold efforts under reasonable mechanics, has a carrying capacity of up to 200KN. Scaffold disk saves the amount of steel.
5, instead of the traditional dish button up scaffolding scaffolding activities spare parts easily lost, easily corrupted, and with the general scaffold compared to the amount of steel up to 2/3 of the savings, so to some extent, greatly reducing the economic losses and the cost of the construction unit.
6, removable disk Scaffold very simple to do, a person only needs a hammer can do the whole process of mounting and dismounting. Improve construction efficiency greatly enhanced, two construction workers in just one day be able to complete the construction site of 350m3.
Hot selling adjustable steel props ring lock scaffold
Construction scaffoldings Disc Lock Scaffolding packing and delivery by bundel in 20 or 40 feet containers
Hot selling adjustable steel props ring lock scaffold