(OEM/ODM Factory)compression wear jackets for women
USD $10.00 - $13.00 /Piece
Min.Order:100 Pieces
Dongguan Opete Sporting Goods Co., Ltd.
(OEM/ODM Factory)girls dance gym wear shirts shorts sleeves clothing
Sample cost: can be returned
Size: all sizes (Adults and teenagers)
Sample lead time: about 7 days
Mass production lead time: about 25-35 days
Free designs, best customer service and high quality products.
Functions: dri fit, moisture wicking, anti UV, anti bacterial.
Item name | Wholesale Yoga Wear fitness wear fitness wear wholesale fitness clothing supplex activewear fitness yoga wear ,Brazilian fitness wear,yoga pants |
Fabric Specifiction | Breathable, Durable, wiking, quick-dry, great stretch, comfortable flexible, Light weight, don't see through supplex activewear fitness yoga wear,yoga pants |
Fabric | 1: 87%Nylon/13% spandex: 300gsm-320gsm 2: 73% polyester/27% spandex: 200gsm-250gsm 3: Supplex,Cotton 4: fleece fabric for winter 5. Customized fabric |
Technic | slik printing full sublimation 4 needle 6 thread |
Fastness | Lv3.5 |
Design | OEM and ODM services |
Logo | Embroidered, Printed, Heat Transfer |
Color | Any color/prints can be made |
MOQ | 100PCS per design per color |
Bulk Lead time | About 25-30 days |
Sample lead time | About 5-8 days |
Payment terms | T/T, L/C, Paypal, Western Union |
Size | Multi size optional: XXS-XXL |
1. How to know the price?
Please advise which item you like and the qty, send the photo of the products that you’re interested in or send the link is OK. If you have more specify requirements, please send the inquiry to us.
2. How to get a sample?
Please advise which kind of product you would like to get the sample or send the specify photo with details, some of the sample is free of charge, but some need to make charge.
3. What about the sample fees?
The sample fee is depends on the design and material and logo. Please send the inquiry to us, we will reply you within 12 hours.
4. What is the sample lead time?
The sample lead time will be about 8~10days, depends of the design, the fabric that you chose and our actually sample schedule.
5. What’s the mass production lead time?
The production time is about 20~30days after samples confirm and deposit received.
The exact delivery date will be according to the design, fabric, order qty and actual production schedule.
Products Details:
Our Products compare with other(VS):