Accommodation units and Prefabricated Office
Accommodation units and Prefabricated Office

Accommodation units and Prefabricated Office

USD $1,890 - $3,980 /Set

Min.Order:1 Set

Supply Ability:
30000 Square Meter / Square Meters per Month
Port:
shanghai port
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shanghai, China
Brand Name:
Accommodation units and Prefabricated Office
Model Number:
Accommodation units and Prefabricated Office
Material:
Sandwich Panel
Use:
Carport, Hotel, House, Other, Office, Shop, Warehouse, Carport, Hotel, House, Kiosk,Booth, Office, Shop, Warehouse, Accommodation units and Prefabricated Office

Shanghai Xingfeng Color Board Light Steel Structure Co., Ltd.

Business Type: Manufacturer,Trading Company
Shanghai China
Main Products: Steel Structure Building ,Prefab House ,Light Steel Villa ,Container House ,Sandwich Panel

Product Details

           Accommodation units and Prefabricated Office

Company Information

Accommodation units and Prefabricated Office

 

Product Description

 

Prefab house Joint material: steel column/aluminum alloy 

 

1. Free from the damages by inspects, such as white ants and so on

 

2. Steel code:Galvanizad steel tube 80mmx80mm,60mmx40mm,ect. 

 

3. Designed life span: more than 30 years;

 

4. Green and environment-friendly materials used;

 

5. Seismic resistance up to 8 magnitudes

 

6. Safe---Able to stands for maximum 55 m/s typhoon

 

7. Advanced roof and wall cladding material guarantee excellent acoustic insulation, less 65% energy consumption than the concrete structure.

 

8. Additional 10%-15% net area compared to the traditional building, air cavity between the cladding and main structure guarantees the comfortable indoor space.

 

Prefab house advantage 

1. Easy and quick to install;

2. Excellent load and span capabilities;

3. Significant savings in site installation costs;

4. Panel comes in a range of aesthetically pleasuring colors;

5.  Energy saving thermal insulation;

6.  Superior air tightness for controlled environments;

7. Good reactions to fire properties;

8. Durable, long lasting, stood the test of time in the extremes of harsh climate.

 

 

Prefab house Main material list as following: 

 

Wall: 50mm thick EPS/Rockwool/PU sandwich panel

Roof: 50mm thick EPS/Rockwool/PU corrugated sandwich panel

 

Window: UPVC or Aluminum sliding window( you can choose casement window,doule glazing,ect)

 

Door: double glazing door (security door as optional)

 

 

cheap new mobile homes  Feature:

 * Prefabrication, easy to install and disassemble

 * Lightness, easy to transport

 

 

 

    Accommodation units and Prefabricated Office

 

Accommodation units and Prefabricated Office

Accommodation units and Prefabricated Office

Accommodation units and Prefabricated Office

 

Let's go to see the comfotable inside rooms of house!       Come on

Accommodation units and Prefabricated Office

 

 

 

Our Services

We will provide you with professional installation video or engineers if necessary and  complete after-sales you don't need to worry about anything.if you have any question,please don't hesitate to ask us.

 

 

Packaging & Shipping

 

 

our clientes

Accommodation units and Prefabricated Office 

FAQ

1 . How much time and personnel are required to complete the project with the building system of DreamHouse ?
1.1 . Villa: The construction period varies depending on the size and design. For a villa of 150m ² : 10 days are required for the basic structure and 20 days for decorating with 5 technicians .
1.2 . Mid-size building (home , hotel, office , schools , clinics, etc. ..)
For a 4-storey building with an area of 1500m ² , 20
 days are required to complete the basic construction and 10 days for decoration. The number of technicians required is 20.

1.3 . Steel structure warehouse (factory, workshop , showroom , etc. ..)
Construction times vary depending on the size , the plan and the professional skills of workers. A warehouse of 1000m ², 1 month is required for installation and 20 people for the implementation .

1.4 . Other buildings (bungalows, container house , temporary dormitory , etc. ..)
Construction time : 2 days
Number of Technicians: 6
2 . How long does it take to produce a constructive system?
Generally, 30 days are required to produce a villa or a steel structure building steel structure warehouse or after confirming the architectural level. This is indicated in the quote
3 . How many containers required for my project ?
After confirmation of your request , we send our shipping calculate weight and overall dimensions of all building materials department . After the calculation, we send you our answer.
In general, a 40-foot container is required for the transport of a building with an area of 80m2.

4 . What are the mandatory information to send you to get a quote?

After receiving your first quote, we will send you a complete array that contains all the information we need.

5 . How to ensure that the structure meets the criteria for local buildings ?
Our structures are in line with national and European standards ( Eurocodes 8 TSR ) . We use the latest building technologies and calculations are made according to the rules of art. Finally, an auditor certifies each office building after an on-site inspection .
6 . How to become agent of your company?
First of all, thank you for your interest in our company. Generally , we take as agents that customers who bought our products at a given quantity .
After receiving your request, we will take it into consideration and make a careful assessment .

7.Your buildings are they resistant to hurricanes and earthquakes?
Ideally , the process of construcion based modular steel frames has been developed in Japan to address critical environmental conditions . The strength of steel and modular construction allow the absorption of large loads generated during disasters.

Buildings withstand earthquakes of level 7 on the Richter scale and cyclone with sustained winds up to 100km / h.

8. Do the houses have warranty?

If the goods are damaged in transit , or the house without problems in the case of external damage , we will send you the new goods in the next order. In this case, you can save the high sea freight ! 

You can call me in very time, 24 hours services, I can speak Chinese, English, Spanish.

 

Give us your idea, we give a dream house to you!

Accommodation units and Prefabricated Office 

 

 

Contact Supplier

Mr. DEANY ZHAO Manager Chat Now
Telephone
86-021-57463169
Mobile
18019729789
Fax
86-021-57463159
Address
No.3398 Nanting Road,Zhuanghang Town,Fengxian District,Shanghai Shanghai

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Prefab Houses
Categories
Hi~