Aerial working platform/ for sale
Negotiable /Set
Min.Order:1 Set
Shandong Sea Project Machinery Company Limited
NO | Project | Design value | |||
1 | Total length mm | 5150 | |||
2 | Total width mm | 2010 | |||
3 | Total height mm | 3040 | |||
4 | Front overhang mm | 920 | |||
5 | Rear overhang mm | 1000 | |||
6 | Front Protraction mm | —— | |||
7 | Rear Protraction mm | —— | |||
8 | Minimum ground clearance mm | 190 | |||
9 | Approach Angle (°) | 29º | |||
10 | Departure angle (°) | 16º | |||
11 | Minimum turning diameter mm | 13800 | |||
12 | wheel tread | Front mm | 1190 | ||
Rear mm | 1150 | ||||
13 | Wheelbase mm | 2930 | |||
14 | Total weight kg | 2650 | |||
15 | The load weight of the front axle kg | 1200 | |||
16 | The load weight of rear axle kg | 1450 | |||
17 | Maximum traveling speed km/h | 20 | |||
18 | Maximum grade ability % | 20 | |||
19 | hundred kilometers oil consumption L | 4 | |||
20 | Steering Type | Steering wheel | |||
21 | Number of steel plate spring(front/rear) | 4/5 | |||
22 | Number of tires | 4 | |||
23 | Tire type | Front 5.00-12 /rear5.50-16 Front 5.00-12/rear5.50-16 | |||
24 | Axes | 2 | |||
25 | Platform lifts and falls time without loading anything s | Whole journey time of rising arm | 109 | ||
Whole journey time of falling arm | 70 | ||||
26 | Platform lifts and falls time at its full load | Whole journey time of extending | 120 | ||
Whole journey time of shrinking | 109 | ||||
27 | Extending and shrinking hydraulic ram time s | Vertical hydraulic ram | Shrinking time | 6 | |
Extending | 9 | ||||
28 | Swing speed r/min | 1/4 | |||
29 | Length of boom arm I mm | 3411 | |||
30 | Length of boom arm I II mm | 4697 | |||
31 | Maximum lifting height of platform mm | 12000 | |||
32 | Maximum working height of platform mm | 14000 | |||
33 | Rated load platform kg | 200 | |||
34 | Rated vertical leg span (left / right) mm | 4430 | |||
35 | Horizontal leg span (front / rear) mm | 2660 |