Coiled tubing unit Truck For oil & gas drilling well logging
Coiled tubing unit Truck For oil & gas drilling well logging

Coiled tubing unit Truck For oil & gas drilling well logging

USD $5,000 - $80,000 /Set

Min.Order:1 Set

Supply Ability:
28 Set / Sets per Month
Port:
China any port
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
DYQX
Model Number:
Size
Type:
Other, Tubing
Machine Type:
Other, drilling well logging
Certification:
API

Dongying Qixiang Import & Export Co., Ltd.

Credit Member 4 years
Business Type: Trading Company
Shandong China
Main Products: oilfield equipment ,drilling tools ,stabiizer ,fishing tools ,valve and tools

Product Details

 

Coiled tubing unit is  self-propelled operation equipment and composed of chassis, truck mounted operation unites, BOP stack and so on.

The character of coiled tubing unit is as follow: delicate architecture, convenient transportation and installation, beefy cross-country capability, comfortable operation, large volume capacity, strong lifting ability and so on which make coiled tubing unit suitable for complex operational mode and road transport.

 

1. Main Technical Parameter:

ItemParameters
Max.Capacity(1.25”CT,m)11,280
(1.5”CT, m)7,640
(1.75”CT,m)5,570
(2” CT,m)4,260
Drive mode8×8
Engine Power300kW/2100rpm(400hp/2100rpm)
Outside Dimensions(L×W×H)12.0×2.55×4.00m
Whole Quality kg54,000
Max Speed of Truck km/h83
Max.climb Angle(Full Load)(%)45
Approach Angle (°)26
Departure Angle (°)16
Ground Clearance(DrumLifting mm)320
(Normal Speed Condition mm)200
Min.turning diameter m32
Work Temperature-40℃-+50℃(-4℉-20℉)

2. Technique Features:

1.Integrated design, delicate architecture, small turning radius, high operation efficiency, met little well site and fast installation/disassemble. 
2.Chasses with sectionalized frame is assembled and welded with high intensity hot rolled steel plate, which is light and big load capacity; chassis is full wheel drive and cross-country capability is strong.
3.Elevating control cabin can clearly observe the coiled tubing and the injector head above well. All-weather assembled control room supplies clear and comfortable surrounding with high level insulation, HV (forceful electric power)/ electronic control board, advanced air-condition.
4.Elevating drum can in the frame of truck when normal running; maximal height of transportation is no more than 4m with nominal hang equipment and minimum ground clearance can raise from 200mm to 600mm under complicated road conditions, which improve noticeably adaptability. 
5.Drum is driven by hydraulic pressure, and it only needs to replace three top rolls of racker roller, injector head holder and gooseneck, then 1”~2 3/8’’ tubing may be applied. These replacement units is humanity, simple and quick, low labor intensity .
6.Advanced injector head with four chains has terse architecture and strong lifting ability; and four chains construction can decline effectively coiled tubing deformation during injection process. Two tandem injector heads can meet complex well condition under special necessary surrounding. 
7.Injector head and related pressure control unites lies beside of the truck and coiled tubing is in injector head from start to finish under transportation environment.
8.Chasses has passed the quality of 3C, and injector head, control cabin have passed the quality of ATEX and met well site explosion proof demand which have high safety. 
9.SmartMonitor control system is adopted, performance is steady and maintenance is convenient.

Contact Supplier

Ms. Eve Liu General Manager Chat Now
Telephone
0086-0543-7613911
Mobile
0086-18554639639
Address
Number 352, North 2nd, Dongying Zone Shandong

You May Like

New Products

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mining Machine Parts
Categories
Hi~