China Supply cylinder of chocolate thermal machine
USD $5,000 - $25,000 /Set
Min.Order:1 Set
AMC System Technology (Suzhou) Co., Ltd.
China Supply cylinder of chocolate thermal machine
Brief Introduction:
Chocolate thermal cylinder is in the chocolate production necessary equipment, mainly uses in after the correct grinding chocolate syrup heat preservation storing, satisfies the chocolate production the technological requirement, adapts the continuous production request. This product besides has functions and so on temperature decrease, elevation of temperature, heat preservation, may carry on to the chocolate pulp does not stop stirs, but also has the degasification, the air sweetening, to dehydrate as well as to prevent functions and so on pulp fat separation.
Technical Parameter:
Type | Capacity (L) | Power (KW) | Weight (KG) | Dimension (mm) |
ABW10000 | 10000 | 11 | 5000 | C 2250*3800 |
ABW5000 | 5000 | 7.5 | 3000 | C 2200*2250 |
ABW3000 | 3000 | 5.5 | 2000 | C 1900*2150 |
ABW2000 | 2000 | 3 | 1500 | C 1700*2100 |
ABW1000 | 1000 | 2.2 | 1000 | C 1220*1850 |
ABW500 | 500 | 1.5 | 600 | C 1000*1380 |
ABW300 | 300 | 1.5 | 200 | C 900*1250 |
ABW200 | 200 | 1.1 | 180 | C 800*1150 |
ABW100 | 100 | 1.1 | 150 | C 650*950 |
Benefit:
1. More professional and experienced suggestion and solution will be given.
2. Innovation, our R & D dept are always work for a better solution.
3. Energy Saving and Environmental Protection.
4. Reliable and safe.
5. Nice Appearance.
6. Easy Clean and Maintenance.
7. Unique Design as you request.
8. Precise temperature control.
Advantage:
a. Specializing in this field for more than 10 years, we’ve been the Global Supplier of multinational companies.
b. Have own R&D Dept. & Production Equipment.
c. A number of Practical Patents in the Energy Saving and Environmental Protection.
d. CE,TUV, ISO, AQA Certificated.
e. Nice appearance.
f. Unique Design for Easy cleaning & Maintenance.
g. Various of dimensions, customized is available.
h. Precise temperature control by separated zones used.
I . Precision engineering.
Package:
According to the customer requirements
FAQ:
1. Delivery Time:
40 working days after receiving the payment
2. Terms of payment:
50% T/T in advance, the balance shall be paid before the shipment. The above price is based on current exchange rate, if the exchange rate changed 2%, we cannot keep the price.
3. Factory Test:
Following assembly, we always conduct a Factory Acceptance Test (F.A.T), often with the participation of our customers.
4. On-site Installation Final assembly often takes place in cooperation with the customer.
5. Testing & Training (If you need):
The plant layout design, assembling, installation and debugging, startup and local team training will be Free at no cost. But the buyer should be responsible for the roundtrip air tickets, local transportation, board & lodging, and USD $ 45/day/person for the pocket money to our technicians.
About Us: