plastic kitchen ware mould
USD $7,000 - $10,000 /Set
Min.Order:1 Set
Taizhou Shiny Tool & Mould Co., Ltd.
SHINY TOOL & MOULD CO.,LTD Add: No.29 Maofeng Street, Northern Industrial Zone, Huangyan Taizhou Zhejiang,China. P.C: 318020 Tel: +86-576-8916-3992 Fax: +86-576-8916-3997 Mobile: +86-138-5761-5995 http://shinymould.en.china.cn
|
Container Mould Making Process
Processing | Time |
Steel Preparing | 7 days |
CNC Machining | 9 days |
Drill | 7 days |
Heat treatment | 5 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 4 days |
Polishing | 4 days |
T1 mould test | 2 days |
Mould Steel
1. cavity and core steel: P20 mould steel, made in Chin, HRC29-30.
2. inserts & slides steel: H13(DIN1.2344), tempered with HRC42-55, Nitrited with HRC60-65, measure up to D-M-E metric standard
3. mould spare parts: H13 ( DIN1.2344), tempered with HRC40-45, Nitrited with HRC60-62, measure up to D-M-E metric standard.
Delivery Date
The first testing sample will be sent to the buyer within 50 days after 3D mould drawing was confirmed.
plastic injection household moulds