Construction Metal Punched Scaffolding Deck machine
USD $120,000 - $200,000 /Set
Min.Order:1 Set
Wuxi Sunway Machinery Co., Ltd.
Construction Metal Punched Scaffolding Deck machine
Brief Introduction
Metaldeck scaffolding is revolutionary metal decking access platform for tubular scaffolds since fist introduces, has established a reputation for reliable and safe performance. The strong yet lightweight galvanized metal scaffold deck is now used extensively throughout the industry in place of conventional timber. The METAL DECK is placed by the scaffolding in order to bridge (span) its frames and create a horizontal level (work area platform). During placement on the side of the scaffolding frame, each METALDECK must be "secured" at the bottom with a specific security pin in order to ensure the safe placement and to avoid its involuntary elevation.
Scaffolding Platform Side Board Roll former ship foot pedal roll forming machine is composed of de-coiler, guide feeder, leveler, continuously punching machine, notching machine, roll forming, correction, cutting, collection table, electrical control system etc.
General machine photo show with different profiles
Machine Technical parameter
The technical parameter will be some different if with different profiles!
We can design and make machines according to customer profiles!
No | Part | Model and specific | Quantity | Motor power (KW) | Remarks |
1 | Uncoiler | 5T Automatic | 1 |
|
|
2 | Straightener |
| 1 | 5.5KW |
|
3 | Servo feeder | With individual control system | 1 | 3KW |
|
4 | Press machine | Yangli | 1 | 160T | with mould |
5 | Notchning machine |
| 1 |
| According to customer profile |
6 | Roll forming machine | Single station structure, with gearbox drive | 1 | 18.5KW |
|
7 | Cutter |
| 1 |
|
|
8 | Conveyor | Length: 3m | 2 |
|
|
9 | Controller | Whole machine PLC | 1 |
|
|
10 | Spare part |
|
|
|
|
Payment Term and condition
* Payment Term: 30 T/T in advance, 70% T/T before delivery
* Delivery Time: Within 90 Days after receipt of the down payment
* Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5 days
* Transporting: 2x40ft container
Container loading
Service
1. Design and produce machine full according client's requirement.
2.We will offer the include foundation drawing ,water ,electric,air layout drawing after we sign the contract. Operating manual will come along with the machine , the size and model of the purchased part and easily damaged part drawing also include.
3.My company will send 1-2 engineer(according your requirement) to installing the machine and responsible for training the worker of customer until they can operating the machine skillful.
Factory picture
If you need more information, please be free to contact me anytime!
I am sincerely to offer our best quality and service to meet your requirements!!!
steel scaffolding panel making machine
Construction Metal Punched Scaffolding Deck machine