Q195 steel construction galvanized scaffolding metal deck
Q195 steel construction galvanized scaffolding metal deck
Q195 steel construction galvanized scaffolding metal deck
Q195 steel construction galvanized scaffolding metal deck
Q195 steel construction galvanized scaffolding metal deck
Q195 steel construction galvanized scaffolding metal deck

Q195 steel construction galvanized scaffolding metal deck

USD $8 - $20 /Piece

Min.Order:1000 Pieces

Supply Ability:
20000 Piece / Pieces per Month
Port:
shanghai
Payment Terms:
T/T D/P D/A Credit Card

Quick Details View All >

Place of Origin:
Jiangsu, China
Brand Name:
SunWay
Model Number:
Galvanized Safety Catwalk
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Planks

Wuxi Sunway Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Wuxi Jiangsu China
Main Products: roll forming machine ,sandwich panel production line ,slitting line ,cut to length line ,welded pipe machine

Product Details

Q195 steel construction galvanized scaffolding metal deck

Product Description

 steel walking boards offer a non slip steel stage working platform to enable workers work on the scaffolding structure.

 

 Main features

1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).

2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.

 

 

Products show

Q195 steel construction galvanized scaffolding metal deckQ195 steel construction galvanized scaffolding metal deckQ195 steel construction galvanized scaffolding metal deck Details

Size (mm)

Weight (kg/pc)

Size (mm)

Weight (kg/pc)

WALK BOARDS

CATWALK

210 x 45 x 1.2 x 4000

13.60

500 x 50 x 1.2 x 1829

15.50

210 x 45 x 1.2 x 3000

10.26

480 x 45 x 1.2 x 1829

13.50

210 x 45 x 1.2 x 2000

6.93

450 x 45 x 1.2 x 1829

13.00

210 x 45 x 1.2 x 1000

3.59

450 x 38 x 1.2 x 1829

12.50

240 x 45 x 1.2 x 4000

14.87

420 x 45 x 1.2 x 1829

12.50

240 x 45 x 1.2 x 3000

11.23

500 x 50 x 1.2 x 1219

11.00

240 x 45 x 1.2 x 2000

7.59

480 x 45 x 1.2 x 1219

10.00

240 x 45 x 1.2 x 1000

3.94

450 x 45 x 1.2 x 1219

9.50

250 x 50 x 1.2 x 4000

15.67

450 x 38 x 1.2 x 1219

9.00

250 x 50 x 1.2 x 3000

11.84

420 x 45 x 1.2 x 1219

9.00

250 x 50 x 1.2 x 2000

8.00

330 x 50 x 1.2 x 1829

11.50

250 x 50 x 1.2 x 1000

4.15

330 x 50 x 1.2 x 1219

8.50

 

Packaging & Shipping

Q195 steel construction galvanized scaffolding metal deck 

Factory Equipment

Q195 steel construction galvanized scaffolding metal deck 

Company Information

WuXi Leading Metal, SunWay has a long and proud history of customer service in China. The belief that our customers are our priority is core to the values of the SunWay people, whose talents and energy are aimed at building long term relationships with our customers by adding value to theirbusinesses.

Q195 steel construction galvanized scaffolding metal deck

WuXi Leading Metal, SunWay has a long and proud history of customer service in China. The belief that our customers are our priority is core to the values of the SunWay  people, whose talents and energy are aimed at building long term relationships with our customers by adding value to theirbusinesses.

Q195 steel construction galvanized scaffolding metal deck 

Certifications

Q195 steel construction galvanized scaffolding metal deck 

FAQ

Q1: How does your company do regarding Quality Control?
A1: Quality is very important and always be put at the first place. SY team members always pay great attention to quality controlling from the very beginning to the end.

 

Q2: Can I get some Samples?
A2: Yes, sure, we are honored to offer you samples.

Q3: What’s the delivery time?
A3: 15~30 days after T/T prepayment or L/C date.

Q4: What is your method of Transportation?
A4: We deliver by shipping,container,break bulk or as your requirements.

 

Q5: What can you do for us?
A5: We always shorten delivery time for our buyer.
We always package steel products well.
We always fix steel product in container well to make it safe arrive at destination port.
We always provide best and professional forward service and after sales service.

Q195 steel construction galvanized scaffolding metal deck

Contact Supplier

Mr. Tom Li Sales Manager Chat Now
Telephone
86-510-83209229
Mobile
18912378468
Fax
86-510-83218366
Address
NO.57 A of Yangming Industrial Park Wuxi,Jiangsu

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Ladders & Scaffoldings > Ladder & Scaffolding Parts
Categories
Hi~